[wtp-dev] Minutes of the WTP Status Telecon, 2006-06-15
|
See WTP Status Telecons [1] for more
information.
[1] http://eclipse.org/webtools/development/status-telecons/index.html
1. WTP 1.5 Status
6/14 3:00 PM, last review of any
bugs other than blocking or major regressions, all other important ones
should be targeted to 1.5.1
(we will, btw, start 1.5.1 builds as soon as we are "done" with
1.5 ... there need be no long delays).
6/14 "end of business" ... final "I-build" for the
week, to be smoke tested on Thursday, declared on Friday.
6/15 smoke test
6/17 I-build declared
6/20 (Tuesday) RC5 Declared: produced for callisto (expected to be same
as I-build, unless blocking issues found)
(except we will be sure to move up to
RC's of GEF and JEM, if we have not moved up by then).
6/22 Calliso RC5 goes "live".
6/22 an I-build produced, if needed
6/23 an I-biuld declared, if needed
6/27 Last chance to do any final build, only if needed
6/28 all final release zips and update site files must be complete by _the
morning_ of this date
6/30 Release goes live ... so, what the heck, take the next day off :)
1.1 WTP 1.5 Build Status
- David Williams
1.2 WTP 1.5 Targeted
Bugs [1] - Jeffrey Liu
We've entered code freeze. We will not
fix a bug unless it is stop ship. We still have 2 bugs targeted to the
1.5 release, can owners provide status for them?
[1] https://bugs.eclipse.org/bugs/buglist.cgi?classification=WebTools&product=Web+Tools&target_milestone=1.5+M4&target_milestone=1.5+M5&target_milestone=1.5+M6&target_milestone=1.5+RC1&target_milestone=1.5+RC2&target_milestone=1.5+RC3&target_milestone=1.5+RC4&target_milestone=1.5+RC5&target_milestone=1.5+RC6&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED
1.3 P1 Bugs [1] - Jeffrey
Liu
P1 to us mean release defining. Are
we fixing them in 1.5 or defering them? Do we have a good reason why we
are defering them? Owners, please provide status.
[1] https://bugs.eclipse.org/bugs/buglist.cgi?bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&classification=WebTools&product=Web%20Tools&priority=P1
1.4 Marking Bugs as
Deferred - Jeffrey Liu
We currently have lots of serious bugs
that are untargeted. 129 blocking, critical and major bugs [1], and 93
P1 and P2 bugs [2]. If a bug is intended to be fixed in 1.5.1, its target
milestone should be set to 1.5.1. Since these bugs do not have their target
milestones set, does this means we are defering all of them to WTP 2.0
and beyond? Or is it because they are not triaged?
In the past, we used P4 to indicate deferred bugs. We should go through
these bugs and either change their target milestone to 1.5x or mark them
as deferred.
I would also like to revisit the current process of using P4 to indicate
deferred bugs. Personally, I think this process adds lots of overhead to
the bug owner. Imagine someone changes the priority of a bug to P4 in WTP
1.5 for the sake of marking it as deferred. Then changes it back to P2
when we enter WTP 2.0. This is a lot of work and the true priority of the
bug can easily be lost during the process.
I propose we use 1.5_deferred in the status whiteboard field to
indicate a bug that is going to be deferred beyond the WTP 1.5 release.
Comments/suggestions welcomed.
[1] https://bugs.eclipse.org/bugs/buglist.cgi?classification=WebTools&product=Web%20Tools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&target_milestone=---
[2]
https://bugs.eclipse.org/bugs/buglist.cgi?classification=WebTools&product=Web+Tools&target_milestone=---&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&priority=P1&priority=P2
1.5 WTP 1.5 PMC Approved
Bugs [1] - Jeffrey Liu
[1] http://www.eclipse.org/webtools/plans/1.5/ramp-down-bugs-approval.php
1.5 WTP 1.5 Hot Bugs
- Jeffrey Liu
[1] https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=%5Bhotbug%5D&classification=WebTools&product=Web%20Tools&target_milestone=1.5%20M4&target_milestone=1.5%20M5&target_milestone=1.5%20M6&target_milestone=1.5%20RC1&target_milestone=1.5%20RC2&target_milestone=1.5%20RC3&target_milestone=1.5%20RC4&target_milestone=1.5%20RC5&target_milestone=1.5%20RC6&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED
1.6 WTP 1.5 Hot Bug
Requests [1] - Jeffrey Liu
Owners should update the bug status prior
to the status telecon.
[1] https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=%5Bhotbug_request%5D&classification=WebTools&product=Web%20Tools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED
1.7 Bugs to be Triaged
[1] - Jeffrey Liu
QA owners should triage these bugs.
[1] https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=qa_contact&z_axis_field=&query_format=report-table&classification=WebTools&product=Web+Tools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailassigned_to1=1&emailtype1=substring&email1=inbox&format=table&action="">
1.8 Bugs to be Verified
and Closed
Now that development of WTP 1.5 is winding
down it's time to confirm all of the wonderful fixes that have gone into
WTP by verifying bugs. We currently have
2746 bugs that have been resolved
but not verified. A report sorted by reporter is available at [1]. Please
get cracking on verifying your bugs.
...and there are currently 404 bugs that have been verified but not closed.
A report sorted by owner is available at [2]. Most of these should be straightforward
to close. Please fulfil your destiny and scrub this list by closing bugs
that you have already fixed and that have been verified.
[1] https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=reporter&z_axis_field=&query_format=report-table&product=Web+Tools&bug_status=RESOLVED&format=table&action="">
[2] https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=assigned_to&z_axis_field=&query_format=report-table&product=Web+Tools&bug_status=VERIFIED&format=table&action="">
2. WTP 1.5.1 Change
Policy - Tim Wagner
As we wrap up 1.5 and begin branching for
maintenance, a quick reminder of the policy for 1.5.1:
- General expectation: 1.5 adopters should
be able to take 1.5.1 and 1.5.2 without problems
- Binary compatibility is required among all
point releases and 1.5
- Source compatibility is required among all
point releases and 1.5
- Full project interoperability among these
releases (e.g., a project created in 1.5.1 must be usable in 1.5 without
changes)
- Without prior PMC approval, no new, changed,
or deleted
- Extension points
- APIs
- Features (including major UI changes)
- Bug fixes and performance enhancements are
generally ok and do not require PMC approval until rampdown
3
WTP 1.0.3 Status -
David Williams
3.1 WTP 1.0.3
approved bugs [1]
- Jeffrey Liu
[1] http://www.eclipse.org/webtools/plans/1.0.3/ramp-down-bugs-approval.html
4. Dali Review Update
- Tim Wagner
5. Other Business -
Open
Congratulations Peter for becoming a
committer!
Test coverage for all WTP classes/methods[1]
[1] http://download.eclipse.org/webtools/downloads/drops/S-1.5RC3-200605182217/apiresults/full_test_coverage/api-tc-summary.html
Jeffrey Liu
IBM Rational Software
IBM Toronto Lab.
8200 Warden Ave. Markham, Ontario, L6G 1C7
Internal mail: D3/UMZ/8200/MKM (D3-268)
T/L: 969 3531
Tel: (905) 413 3531
Fax: (905) 413 4920
jeffliu@xxxxxxxxxx