Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [jdt-dev] [eclipse-dev] Automate check to warn about freeze on Gerrit

Hi Mickael,

I received a Git Freeze message for the gerrit [1] with a test skip. Since master is open already [2], is there a bug here wrt dates?
Or maybe I missed out some info regarding this in the mail chain?

[1] https://git.eclipse.org/r/c/jdt/eclipse.jdt.core/+/173584
[2] https://www.eclipse.org/lists/platform-releng-dev/msg37008.html

Regards,
Manoj

-----jdt-dev-bounces@xxxxxxxxxxx wrote: -----
To: "Eclipse JDT general developers list." <jdt-dev@xxxxxxxxxxx>
From: Mickael Istria
Sent by: jdt-dev-bounces@xxxxxxxxxxx
Date: 12/08/2020 04:46PM
Cc: "General development mailing list of the Eclipse project." <eclipse-dev@xxxxxxxxxxx>
Subject: [EXTERNAL] Re: [jdt-dev] [eclipse-dev] Automate check to warn about freeze on Gerrit

Thanks all for the feedback, please see reactions inline. On...                                                                                                                                                                                      This Message Is From an External Sender This message came from outside your organization.
Thanks all for the feedback, please see reactions inline.

On Tue, Dec 8, 2020 at 12:03 PM Noopur Gupta <noopur_gupta@xxxxxxxxxx> wrote:
This validation should be through a separate bot which will add a -1 on the Gerrit patch if the freeze period (taken from releng calendar) is active.

OK, and I agree here. I've opened https://bugs.eclipse.org/bugs/show_bug.cgi?id=569541 to ask for a new bot.
 
It should include a clear comment and link to the freeze plan section (similar to the CQ comment/link).

That's already covered
 
It doesn't need to add any comment during the non-freeze period to avoid too many Gerrit messages.

OK, I tweaked the job configuration to ignore "Success", I think it should work, we'll see.
 
The existing bot should continue to give a +1/-1 based on the Gerrit build status of the patch.

Sure, that is not changed at all; and having a separate bot would also comfort that.
 
A single job is better due to centralization as the freeze/RC dates and rules are the same for all these projects.

OK.
It will be good if we can rename this bot to something like Freeze Bot instead of Platform Bot for more clarity.

That's part of https://bugs.eclipse.org/bugs/show_bug.cgi?id=569541

Cheers,

_______________________________________________
jdt-dev mailing list
jdt-dev@xxxxxxxxxxx
To unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/jdt-dev



Back to the top