The submission deadline is the deadline for all CQs. The May
deadline was for IP log submission.
I agree that if Sisu and Aether have both been adopted by a release
version of Maven, that this is a pretty clear indication that they
are mature technology.
Have the Sisu and Aether projects been contacted regarding
graduation? I'd love to hear their opinion regarding their
readiness.
If, theoretically, we could get Sisu and Aether to graduate early in
the new year, is it possible to create a new release of Maven based
on the 1.0 code in time for the simultaneous release?
FWIW, if m2e depends on the specific version of Maven that includes
Sisu and Aether, including that version of Maven in the project
downloads means that the downloads must be marked as "incubating".
By extension, any Eclipse package that includes m2e would have to be
similarly-marked. Note that this does not mean that m2e itself needs
to be moved back into an Incubation phase.
Wayne
On 12/16/2013 10:39 AM, Mike
Milinkovich wrote:
On
16/12/2013 9:39 AM, Igor Fedorenko wrote:
Wasn't there another deadline in February
for new CQ submissions?
I _think_ that's for new dependencies, not a new version of an
existing dependency. But Wayne or Janet are the experts.
|