[epf-dev] RE: Re: PM stuff
 | 
Per, I checked them out and they pretty good -- nice job! 
As far as the templates, a couple of things... 
 
1) Related to usability and look-and-feel, I think we 
should consider a slightly different layout - different headers/footers and 
styles. While these templates are definitely less formal that what's in RUP, 
they still look like RUP to me (but that could be because I'm too familiar with 
it). 
 
2) Project plan: I think the sections you have and how 
they've been completed are appropriate. I think we should add the development 
process section (as it is mentioned as a step in "Plan the Project"). For PM at 
least, I'd like to ensure that the steps of the process match the work products 
(and their supporting templates). I.e. if we say "Define the process for the 
project" in "Plan the Project" and the "Project plan" is an output of that task, 
then there should be something in that work product/template to handle that step 
(i.e. a place to describe the project's process). Of course, in this instance, 
the other option is to remove the "Define the process for the project" step and 
then they'd match! :-)
 
3) Iteration plan: Similarily the sections look 
appropriate. The "Iteration Objectives" section is simpler (and less confusing) 
than the table that is in the original template. I presume "Measure Results" are 
the iteration evaluation criteria (which corresponds with the "Identify system 
elements to test" step in the "Plan Iteration" task)? 
 
What about risks? Should we describe them here (as the 
subset of risks relevant to the current iteration) or separately (as the 
complete list of all risks)? 
 
What pieces of data do we expect leads to provide for work 
items (getting back to the issue at hand)? For EPF, do we capture points for 
work items in the burndown chart or in the iteration plan? Is this where a lead 
would expand the work items into smaller assignable things (either sub-work 
items or tasks) and provide effort estimates and effort allocation by week? 
 
Based on the current burndown chart, there doesn't seem to 
be a place to put points (where it seems like it should be since Bugzilla can't 
capture this). I think we should be measuring development burndown by iteration 
(not by week as the current chart does). It does not appear as if we can really 
capture and measure iteration burndown since the current chart cannot 
accommodate effort allocation by week (and we'd also need another actual chart 
for each iteration's burndown).
 
One thing I'm not quite sure about with the option of 
having one list, is how does one distinguish between an item that is to used to 
measure requirement coverage (i.e. development burndown) and an item that is to 
be used to measure expenditure of effort (i.e. iteration burndown)? Should that 
option prevail, we'd have to clearly describe how to calculate these 
two metrics from one list (and have it clearly represented in the 
supporting templates and EPF examples). 
 
Thanks, Chris ~:|
 
 
Hi Chris, I felt that these templates / examples were a little bit 
more advanced than I would like to include in OpenUP / use for EPF. Whenever in 
doubt, I suggest we go for less.... I do 
think that there are a few good things I should include in the EPF proj plan, 
such as measurement and project organization. I think that it would be 
interesting for people to know who is actually working on the project (Committer 
as well as contributors). So I suggest I add that. Cheers Per 
Kroll
STSM, Manager Methods: RUP / RMC
Project Lead: Eclipse Process 
Framework
Rational Software, IBM Corp
408-342-3815 
  
  
    | "Chris Armstrong" 
      <chris.armstrong@xxxxxxxxxxxxxxxxx> 
       07/11/2006 08:56 AM 
       
        
        
          | 
             Please respond 
            to <chris.armstrong@xxxxxxxxxxxxxxxxx>  |    
     | 
      
        
        
          | 
             To 
           | Per 
            Kroll/Cupertino/IBM@IBMUS 
         |  
          | 
             cc 
           | 
         |  
          | 
             Subject 
           | PM stuff |    
      
  | 
<<...>> <<...>> 
Chris Armstrong ~:| 
President 
Armstrong Process Group, Inc. 
651.491.5575 c 
715.246.0383 f 
www.aprocessgroup.com 
    "proven 
practical process" 
Come see APG at: 
--------------- 
Agile 2006 International Conference 
Minneapolis, MN, July 23-28, 2006 - www.agile2006.com 
--------------- 
14th IEEE International Requirements Engineering 
Conference 
Minneapolis, MN, September 11-15, 2006 - www.re06.org