We invoke Team > Synchronize only with the generated parent since
it contains all the code and prevents the duplication in the
Synchronize view when all are synchronized. I think the parent-child
layout reflects modules, we have three layers - parent (pom project)
> features/plugins/tests (pom projects) > plugins/features.
Makes for a lot of projects in the workspace but we rarely interact
with the parent hierarchies except to modify their poms. Most of the
time we're working in "normal" root projects. Not sure why the
projects displayed under the generated parent don't show change icon
overlay though.
Craig
On 12-05-29 06:08 AM, tong123123 wrote:
as the attached image shown, in m2eclipse, if I have one
parent project and two child projects, when import to
m2eclipse, the layout becomes three project, one is
parent
---------child1
---------child2
the second is
child1
the third is
child2
and if I change child1 in second project, it will synchronize
with the child1 in parent project.
But now I have svn commit parent and two childs project, so
the first
parent
---------child1
---------child2
has svn symbol for change and can check check from repository,
but the second and third project cannot!!