Hi,
I created the stable-5.5 branches and contributed milestone 5.5.0 M3 to the
release train's 2019-09 M3 milestone and bumped the version to 5.6.0-SNAPSHOT
on master. On the master branch you can download the 5.5.0 M3 p2 repository [1]
and use it as API baseline for 5.6 until the final 5.5.0 is released.
There are 2 release candidates for the release train ahead. We can contribute to
- RC1 until Wed Sept 4
- and to RC2 until Wed Sept 11
- GA is on Wed Sept 18
See [2] for the release train schedule.
Move fixes pending in review which you want in 5.5.0 to the stable-5.5 branch.
You can use Gerrit's Move Change REST API to move an open change to another branch [3].
This will only modify the change metadata. You still have to rebase the corresponding
git commits to stable-5.5 and push them to stable-5.5 for review otherwise they cannot
be submitted if they are still on the wrong base version. Let me know if you need help,
I can also move changes for you.
(in newer Gerrit versions there's a button in the UI for moving changes)
-Matthias