Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[eclipse-pmc] Rebuilds and RC4

I have a dilemma: from a p2 standpoint RC4 could be declared. However during the afternoon the testing for a fix uncovered a new problem that we would like to fix.
Therefore the question is: should I say no go on RC4 and wait for a re-build on Monday along with some other doc changes or should we call RC4 done and do an extra RC?

Thx

PaScaL


Back to the top