Re: [cross-project-issues-dev] Simultaneous Release 2019-06 opt-in

Great, thanks Fred!

--
Sam Davis
Senior Software Engineer, Tasktop
Committer, Eclipse Mylyn
http://tasktop.com


On Fri, May 10, 2019 at 3:55 AM Frederic Gurr <frederic.gurr@xxxxxxxxxxxxxxxxxxxxxx> wrote:
Hi,

After merging https://git.eclipse.org/r/#/c/141899/ I have rebased and
merged https://git.eclipse.org/r/#/c/141920/.

@Sam: I'm not aware of anyone deliberately removing your commit rights
for simrel. Please open a Bugzilla issue to resolve this:
https://bugs.eclipse.org/bugs/enter_bug.cgi?product=Community&component=Cross-Project.

Regards,

Fred

On 10.05.19 01:30, Sam Davis wrote:
> Thanks. I would appreciate it if someone can merge that review for me
> once the build is fixed.
>
> --
> Sam Davis
> Senior Software Engineer, Tasktop
> Committer, Eclipse Mylyn
> http://tasktop.com
>
>
> On Thu, May 9, 2019 at 4:29 PM Matthias Wienand
> <matthias.wienand@xxxxxxxxx <mailto:matthias.wienand@xxxxxxxxx>> wrote:
>
>     Hi,
>
>     I removed the old milestones and updated the GEF contribution, so
>     the error will be gone once that is merged. I should have waited for
>     the merge before removing the site, though. Sorry for the inconvenience.
>
>     Best regards,
>     Matthias
>     --
>
>     Matthias Wienand
>     B.Sc. Softwaretechnik
>     Software Engineer
>
>     Telefon: +49 231 9860 202
>     Telefax: +49 231 9860 211
>     Mobil:   +49 152 26802283
>
>
>     matthias.wienand@xxxxxxxxx <mailto:matthias.wienand@xxxxxxxxx>
>     http://www.xing.com/profile/Matthias_Wienand2
>     http://www.itemis.de
>
>
>     itemis AG
>
>     Am Brambusch 15-24
>     44536 Lünen
>
>     Rechtlicher Hinweis:
>     Amtsgericht Dortmund, HRB 20621
>     Vorstand: Jens Wagener (Vors.), Wolfgang Neuhaus, Abdelghani El-Kacimi
>     Aufsichtsrat: Prof. Dr. Burkhard Igel (Vors.), Michael Neuhaus,
>     Jennifer Fiorentino
>
>>     Am 10.05.2019 um 01:23 schrieb Sam Davis <sam.davis@xxxxxxxxxxx
>>     <mailto:sam.davis@xxxxxxxxxxx>>:
>>
>>     Hi, Mylyn will participate, and I have pushed a review touching
>>     the aggrconfile, however I seem to no longer be a committer on the
>>     simrel project for some reason??? I cannot approve the review and
>>     had to sign-off on it. Also the build fails with an apparently
>>     unrelated error about GEF:
>>
>>     https://git.eclipse.org/r/#/c/141920/
>>
>>         *16:18:25* Loading all repositories
>>         *16:18:26* Unable to load repository file:/home/data/httpd/download.eclipse.org/tools/gef/updates/milestones/5.0.400M2_gef-master_5261 <http://download.eclipse.org/tools/gef/updates/milestones/5.0.400M2_gef-master_5261>
>>         *16:18:27* Unable to load repository p2:file:/home/data/httpd/download.eclipse.org/tools/gef/updates/milestones/5.0.400M2_gef-master_5261 <http://download.eclipse.org/tools/gef/updates/milestones/5.0.400M2_gef-master_5261>
>>         *16:18:27* Build failed! Exception was org.eclipse.core.runtime.CoreException: Not all repositories could be loaded (see log for details)
>>         *16:18:28* Not all repositories could be loaded (see log for details)
>>
>>
>>     --
>>     Sam Davis
>>     Senior Software Engineer, Tasktop
>>     Committer, Eclipse Mylyn
>>     http://tasktop.com <http://tasktop.com/>
>>
>>
>>     On Thu, May 9, 2019 at 12:24 PM Wayne Beaton
>>     <wayne.beaton@xxxxxxxxxxxxxxxxxxxxxx
>>     <mailto:wayne.beaton@xxxxxxxxxxxxxxxxxxxxxx>> wrote:
>>
>>         My apologies if I gave the impression that anybody is late.
>>         The deadline is tomorrow. 
>>
>>         Wayne
>>
>>         On Thu, May 9, 2019 at 1:35 PM Matthias Wienand
>>         <matthias.wienand@xxxxxxxxx
>>         <mailto:matthias.wienand@xxxxxxxxx>> wrote:
>>
>>             Hi Wayne,
>>
>>             I just updated GEF.aggrcon file. I had it on my list, but
>>             did not get to it yesterday… Sorry for being so late.
>>
>>             Best regards,
>>             Matthias
>>             --
>>
>>             Matthias Wienand
>>             B.Sc. Softwaretechnik
>>             Software Engineer
>>
>>             Telefon: +49 231 9860 202
>>             Telefax: +49 231 9860 211
>>             Mobil:   +49 152 26802283
>>
>>
>>             matthias.wienand@xxxxxxxxx <mailto:matthias.wienand@xxxxxxxxx>
>>             http://www.xing.com/profile/Matthias_Wienand2
>>             http://www.itemis.de <http://www.itemis.de/>
>>
>>
>>             itemis AG
>>
>>             Am Brambusch 15-24
>>             44536 Lünen
>>
>>             Rechtlicher Hinweis:
>>             Amtsgericht Dortmund, HRB 20621
>>             Vorstand: Jens Wagener (Vors.), Wolfgang
>>             Neuhaus, Abdelghani El-Kacimi
>>             Aufsichtsrat: Prof. Dr. Burkhard Igel (Vors.),
>>             Michael Neuhaus, Jennifer Fiorentino
>>
>>>             Am 08.05.2019 um 22:04 schrieb Wayne Beaton
>>>             <wayne.beaton@xxxxxxxxxxxxxxxxxxxxxx
>>>             <mailto:wayne.beaton@xxxxxxxxxxxxxxxxxxxxxx>>:
>>>
>>>             Greetings Simultaneous Release 2019-06 participants.
>>>
>>>             Per our process, I have started to assemble the
>>>             participants list for 2019-06
>>>             <https://projects.eclipse.org/releases/2019-06>.
>>>
>>>             By way of reminder, the process requires
>>>             <https://wiki.eclipse.org/SimRel/Simultaneous_Release_Requirements#State_intent_early>
>>>             that project teams signal their participation by making a
>>>             change to their aggrcon file in the simrel repository.
>>>             For project teams that intend to drop out of the
>>>             simultaneous release, the process requires that you
>>>             inform the group and then remove your aggrcon file.
>>>
>>>                 For projects that did participate in the previous
>>>                 simultaneous release, the project team's
>>>                 representative must touch the project's aggrcon file
>>>                 by the milestone 2 (M2) date of the release to
>>>                 indicate that the project wishes to continue
>>>                 participating and that they project team is paying
>>>                 attention.
>>>
>>>
>>>             AFAICT, 49 project teams have changed their aggrcon file
>>>             since the start of this release cycle. I have captured my
>>>             best guess at the version that each project is
>>>             participating with. Please have a look and let me know
>>>             what I've gotten wrong.
>>>
>>>             Note that if you are adding a new version of your content
>>>             (major, minor, or service), you need to create a release
>>>             record. Make sure that your release record has
>>>             "2019-06-19" as the release date (I did notice that least
>>>             one existing release record showed 2019-06-20 as the
>>>             release date; please have a look and fix your record if
>>>             this is you).
>>>
>>>             Please create the release record (or ensure that it has
>>>             been created) before you tell me that I've listed the
>>>             wrong version.
>>>
>>>             Version names must include some form of a semantic
>>>             version. You can prefix or suffix version names as you'd
>>>             like. The convention appears to be to not prefix or
>>>             suffix, or to include the simultaneous release name as a
>>>             suffix.
>>>
>>>             Note that the PMI doesn't handle numbers appearing before
>>>             the semantic version very well, but I have a fix in the
>>>             queue that should sort this out in time for the release.
>>>
>>>             I intend to do a pass over the simrel repository again on
>>>             Friday, May 10 (M2) to bring the participation list up to
>>>             date and will start the public shaming of those who have
>>>             not followed the rules sometime thereafter.
>>>
>>>             Per the December 2018 update to the EDP, project teams
>>>             are not required to engage in a release review if they've
>>>             engaged in one in the year leading up to their release
>>>             date. No review is required. No PMC approval is required.
>>>             No IP log review is required. /Remember that whether or
>>>             not you engage in a review, project teams are required to
>>>             follow the Eclipse IP Due Diligence Process. Your
>>>             releases must only include IP that has been either
>>>             "license certified" or "approved" by the IP Team. /I will
>>>             initiate a scan of the repository tonight to ensure that
>>>             unvetted IP has not been inadvertently added.
>>>
>>>             Thanks for your attention.
>>>
>>>             Wayne
>>>
>>>             --
>>>             Wayne Beaton
>>>             Director of Open Source Projects | Eclipse Foundation, Inc.
>>>             _______________________________________________
>>>             cross-project-issues-dev mailing list
>>>             cross-project-issues-dev@xxxxxxxxxxx
>>>             <mailto:cross-project-issues-dev@xxxxxxxxxxx>
>>>             To change your delivery options, retrieve your password,
>>>             or unsubscribe from this list, visit
>>>             https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
>>
>>             _______________________________________________
>>             cross-project-issues-dev mailing list
>>             cross-project-issues-dev@xxxxxxxxxxx
>>             <mailto:cross-project-issues-dev@xxxxxxxxxxx>
>>             To change your delivery options, retrieve your password,
>>             or unsubscribe from this list, visit
>>             https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
>>
>>
>>
>>         --
>>         Wayne Beaton
>>         Director of Open Source Projects | Eclipse Foundation, Inc.
>>         _______________________________________________
>>         cross-project-issues-dev mailing list
>>         cross-project-issues-dev@xxxxxxxxxxx
>>         <mailto:cross-project-issues-dev@xxxxxxxxxxx>
>>         To change your delivery options, retrieve your password, or
>>         unsubscribe from this list, visit
>>         https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
>>
>>     _______________________________________________
>>     cross-project-issues-dev mailing list
>>     cross-project-issues-dev@xxxxxxxxxxx
>>     <mailto:cross-project-issues-dev@xxxxxxxxxxx>
>>     To change your delivery options, retrieve your password, or
>>     unsubscribe from this list, visit
>>     https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
>
>     _______________________________________________
>     cross-project-issues-dev mailing list
>     cross-project-issues-dev@xxxxxxxxxxx
>     <mailto:cross-project-issues-dev@xxxxxxxxxxx>
>     To change your delivery options, retrieve your password, or
>     unsubscribe from this list, visit
>     https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
>
>
> _______________________________________________
> cross-project-issues-dev mailing list
> cross-project-issues-dev@xxxxxxxxxxx
> To change your delivery options, retrieve your password, or unsubscribe from this list, visit
> https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev
>

--
Frederic Gurr
Release Engineer | Eclipse Foundation Europe GmbH

Annastr. 46, D-64673 Zwingenberg
Handelsregister: Darmstadt HRB 92821
Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
_______________________________________________
cross-project-issues-dev mailing list
cross-project-issues-dev@xxxxxxxxxxx
To change your delivery options, retrieve your password, or unsubscribe from this list, visit
https://www.eclipse.org/mailman/listinfo/cross-project-issues-dev

Back to the top