The PMI is built on Drupal. Drupal is a content management system.
There is a "Revision Information" tab at the bottom of the page that
you can use to create a new revision whenever you want.
I've been toying with the idea of creating a revision every time the
form is saved. Thoughts?
Wayne
On 03/15/2013 02:29 PM, Ed Willink
wrote:
Hi
On 15/03/2013 18:18, Wayne Beaton
wrote:
How do I make that choice?
Do you like editing XML and doing revision control in Git, or do
you prefer to use a web form?
No, Yes (in a CM), only when it offers me CM.
So on balance I prefer the old way so that I have CM.
How is the choice enforced?
It's not. I just need to see a plan either in the required XML
format, or in the database. In the end, it's just a URL either
way.
If there are two separate copies which is seen by the user?
No. If you provide an XML file, then we'll render it the
old-fashioned way from a link that we'll put on the review
record. Maybe I should include an optional field on the release
record to hold the link.
Please add that link.
Regards
Ed Willink
_______________________________________________
cross-project-issues-dev mailing list
cross-project-issues-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev
|