Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
Re: [cross-project-issues-dev] Capture Kepler participation information

The PMI is built on Drupal. Drupal is a content management system.

There is a "Revision Information" tab at the bottom of the page that you can use to create a new revision whenever you want.

I've been toying with the idea of creating a revision every time the form is saved. Thoughts?

Wayne

On 03/15/2013 02:29 PM, Ed Willink wrote:
Hi

On 15/03/2013 18:18, Wayne Beaton wrote:
How do I make that choice?
Do you like editing XML and doing revision control in Git, or do you prefer to use a web form?
No, Yes (in a CM), only when it offers me CM.

So on balance I prefer the old way so that I have CM.

How is the choice enforced?
It's not. I just need to see a plan either in the required XML format, or in the database. In the end, it's just a URL either way.

If there are two separate copies which is seen by the user?
No. If you provide an XML file, then we'll render it the old-fashioned way from a link that we'll put on the review record. Maybe I should include an optional field on the release record to hold the link.
Please add that link.

    Regards

        Ed Willink


_______________________________________________
cross-project-issues-dev mailing list
cross-project-issues-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev

--
Wayne Beaton
Director of Open Source Projects, The Eclipse Foundation
Learn about Eclipse Projects
EclipseCon
          2013

Back to the top