BIRT PMC,
I will be out of the office next week, I am taking vacation time with
the family. I am still on vacation the following week and will try to
call in on Monday, but I am unsure of how my voice connectivity will
be. If there is something that is critical, could we defer the call to
Tuesday?
The only issue that I have in front of me is the EclipseCon talks.
There are no immediate actions required by our PMC, but there are some
issues that we should be aware of. The original proposal was for BIRT
to have three Tutorial presentations of a half day each. Since then
the other EclipseCon volunteers have decided to modify the Tutorial
presentations into either
- Very Long Talks (VLT) which are two hours with no formal user
interaction.
- Hands On Workshops (HOW) which are three hours with an expectation
for user interaction.
Wenfeng has all ready voted in favor of this format, and I think that
it is a good way to go.
I would propose that we convert our three tutorials into the following
combination of VLT and HOW presentations.
Hard Core BIRT Track (3 VLT)
Audience: Developers and Integrators
BIRT Script (two hours)
BIRT Integration (two hours)
BIRT Extension (two hours)
Developing Reports with BIRT (1 HOW)
Audience: Business Analysts and Report Developers interested in an
introduction to BIRT
Three hours tutorial with hands on demos on the use of BIRT
Does this seem like a reasonable use of our allocated time for the
tutorial presentations?
In terms of the other EclipseCon presentations, we have been allocated:
5 Long talks (1 hour)
6 Short talks (ten minutes)
1 Panel / Demo
2 Demo
I have still not formulated a plan for the best way to create quality
content to fill these time slots. Obviously we would like to get as
much help from our community as possible, but it seems like we should
try to have a plan so that we can coverage over lots of different
aspects of BIRT. If anyone has ideas, let me know.
Scott
|