[wtp-dev] Minutes of the WTP Status Telecon, 2006-06-22


See WTP Status Telecons [1] for more information.

[1] http://eclipse.org/webtools/development/status-telecons/index.html


Attendees

Amy Wu

Arthur Ryman
Chuck Bridgham

Craig Salter
David Williams
Gorkem Ercan
Jeffrey Liu
John Lanuti

Kate Price
Larry Dunnell

Larry Issac
Lawrence Mandel

Nitin Dahyabhai

Rob Frost
Ted Bashor

Tim Wagner


1. WTP 1.5 Status


6/22 an I-build produced, if needed
 

      We do need one. 4 bugs fixed. (Der Ping, Chuck, have you released? marked bugs as fixed?)

               I will start a weekly integration build at noon on Thursday (and pick up final JSF changes too) for
               declaration by noon on Friday. Please plan on some smoke tests in-between there, though the changes
               are small for most. I will label this as our RC6 build, and if we happen to need another one next week, we will
               label it
RC6b. Be sure to spread your platform coverage, be sure to check things like if source from an SDK target
      can be imported, etc.,


6/23 an I-build declared


      Reminder that head should be kept "clean" ... in the event we need some late night, late breaking bug, we may need to do
      a quick head build, just as extra care to make sure it builds, runs well from a true build, etc. before its approved. (I hope not,
      but, let's not tempt fate).



6/27
Last chance to do any final build, only if needed

6/28
all final release zips and update site files must be complete by _the morning_ of this date


6/30 Release goes live ... so, what the heck, take the next day off :)

Note pre-reqs:


As you do your final testing and verifications, please note our final set of pre-reqs.
In particular, the "M" part of the base build has thrown off some people ... its further down on their page, and it is not really "maintenance" ...
it just fit in with their scripts in just the right way. (and RC7 was lucky or something ... maybe they had a bet they wouldn't go past RC7 :)

Note final pre-reqs:


These are most likely the final pre-reqs we build with. Most projects are not planning rebuilds, unless a blocker is found.
I think even if they do re-build next week, for docs or "about" files, any changes would likely not effect us.
Unless you tell me otherwise!

I'd prefer not to re-build, just to re-build, just to avoid churn.
Unless you tell me otherwise!

Do body's expecting any fixes from pre-reqs, right?



David - Will respin this afternoon after this status meeting.

David - No more 1.0.3 builds until the first week of July.

David - 1.5.1 build will start in the first week of July.

1.1 WTP 1.5 Targeted Bugs [1] - Jeffrey Liu

We've entered code freeze. We will not fix a bug unless it is stop ship. We still have 2 bugs targeted to the 1.5 release, can owners provide status for them?


[1] https://bugs.eclipse.org/bugs/buglist.cgi?classification=WebTools&product=Web+Tools&target_milestone=1.5+M4&target_milestone=1.5+M5&target_milestone=1.5+M6&target_milestone=1.5+RC1&target_milestone=1.5+RC2&target_milestone=1.5+RC3&target_milestone=1.5+RC4&target_milestone=1.5+RC5&target_milestone=1.5+RC6&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED

1.2 P1 Bugs [1] - Jeffrey Liu

P1 to us mean release defining. Are we fixing them in 1.5 or defering them? Do we have a good reason why we are defering them? Owners, please provide status.


[1] https://bugs.eclipse.org/bugs/buglist.cgi?bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&classification=WebTools&product=Web%20Tools&priority=P1

1.3 Blocking and Critical Bugs [1] - Jeffrey Liu

Use 1.5_deferred in the status whiteboard field to defer a bug.

[1] https://bugs.eclipse.org/bugs/buglist.cgi?classification=WebTools&product=Web%20Tools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&target_milestone=---

1.4 WTP 1.5 PMC Approved Bugs [1] - Jeffrey Liu

[1] http://www.eclipse.org/webtools/plans/1.5/ramp-down-bugs-approval.php

147949 approved.

148218 conditional approval. Pending investigation of Ted's concern of the "else" clause.

147991 conditional approval. Pending Chuck's investigation.

1.5 WTP 1.5 Hot Bugs[1] and Hot Bug Requests [2] - Jeffrey Liu

[1] https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=%5Bhotbug%5D&classification=WebTools&product=Web%20Tools&target_milestone=1.5%20M4&target_milestone=1.5%20M5&target_milestone=1.5%20M6&target_milestone=1.5%20RC1&target_milestone=1.5%20RC2&target_milestone=1.5%20RC3&target_milestone=1.5%20RC4&target_milestone=1.5%20RC5&target_milestone=1.5%20RC6&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED

[2] https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=%5Bhotbug_request%5D&classification=WebTools&product=Web%20Tools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED

1.6 Bugs to be Verified and Closed

We are down to 2023 bugs to be verified and 508 bugs to be closed.


[1]
http://www.eclipse.org/webtools/development/bugs/top10Resolved.php

[2] http://www.eclipse.org/webtools/development/bugs/top10Verified.php

1.7 WTP 1.5 Wrap-up and Post Release

1. New Site Coverage.

Lawrence - Purpose is to answer questions from users, and make sure information posted is correct.

Lawrence - Will post a note to the dev list asking for volunteers.

2. Test Plans -- important to document and be transparent about the type of testing we do (or, don't as the case may be).

Jeff - We need to document the tests that we are doing. I'll reorganize the test plans on the WTP Web site next week. Component leads, I'll send you instructions on how to update the new test plans.

3. What's new and noteworthy.

 Lawrence - Purpose is to document new features and improved functions.

The following bugs were opened to track this item:

148279  [action] Fill in WTP 1.5 XML new and noteworthy details
148280
 [action] Fill in WTP 1.5 WS new and noteworthy details
148281
 [action] Fill in WTP 1.5 RDB new and noteworthy details
148282  [action] Fill in WTP 1.5 J2EE new and noteworthy details
148283
 [action] Fill in WTP 1.5 Server new and noteworthy details
148284
 [action] Fill in WTP 1.5 SSE new and noteworthy details

4. Readme (releases notes).

Lawrence - Purpose is to document workarounds, common bugs and late breaking bugs. Will post more information to the dev list.

5. Recognition of  contributors


https://bugs.eclipse.org/bugs/show_bug.cgi?id=148063#c4

2. Other Business - Open

Test coverage for all WTP classes/methods[1]

[1] http://download.eclipse.org/webtools/downloads/drops/S-1.5RC3-200605182217/apiresults/full_test_coverage/api-tc-summary.html

Arthur - Jeff, please update the title of the document to Test Coverage instead of API Test Coverage.

David - Does not work with Firefox.

Lawrence - Add the plug-ins with 100% test coverage back to the list.

Bug 148310 was opened to track this item.

Jeffrey Liu
IBM Rational Software
IBM Toronto Lab.
8200 Warden Ave. Markham, Ontario, L6G 1C7
Internal mail: D3/UMZ/8200/MKM (D3-268)
T/L: 969 3531
Tel: (905) 413 3531
Fax: (905) 413 4920
jeffliu@xxxxxxxxxx