Hi,
In the Specification committee Operations
Guide, under the section "Creating a Final Specification,"
step 8 indicates that a formal release record must be created.
I'm currently reviewing Dependency Injection (wave 1) which is
included in the Context and Dependency Injection project.
Presumably, a release record won't be created until the CDI spec
(wave 3) is readied for release.
I presume this is okay, but could someone confirm?
This implies that all the formal EMO and PMC work won't be done,
before this specification has completed its ballot. Assuming this
is accptable, will these notifications (for CDI) need to include
references for both DI and CDI? (I think a consequence of this is
that all the EMO and PMC validation work will be done after the DI
ballot has been completed. I don't know if that is acceptable, or
not.)
Thanks,
-- Ed