Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[cross-project-issues-dev] Ready for Luna (M1) aggregation

I hope everyone has enjoyed their summer vacations ... but now back to work! :)

We do have a preliminary schedule for Luna milestones, see
http://wiki.eclipse.org/Luna/Simultaneous_Release_Plan#Schedule
(though, that one table is only part of that document to review, at the moment).

The complete schedule is still open for review and "tweaking", but the first several milestones are pretty much a given, and the first one is due in two weeks! The overall schedule (of having approximately 6 week milestones) is pretty much just like previous years. The one main difference is that we "moved up" M5 and M6 to make sure M6 finished before EclipseCon 2014 started (so ... we don't allow an "extra week" for end-of-year holidays) and this M5 and M6 change means M7 is a week longer than usual: 8 weeks instead of 7!

As always, we hope everyone in 'kepler' stays in 'luna', but ... to make sure ... we require explicit "buy in". In practice, this means I started the 'master' branch with what ever it was for Kepler, but then set enabled="false" for everyone's contribution.  If you plan to be in Luna, please removed the enabled="false" from your "contribution element". If you are not quite ready to actually make a contribution, you can put enabled="false" in your "repository element" to signify the difference of "planning to participate", but "contribution not ready yet". If nothing else, you may simply have to wait until your pre-reqs make their contributions.

I have enabled the contributions for Eclipse and Equinox (with out likely Luna M1 content), and produced a preliminary "staging" repo ... which has only those two projects in it, at the moment.

Let the fun begin! As always, questions to this list are welcome.