[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
| Re: [wtp-incubator-dev] XSL Tools UI Walk Through July 23rd | 
DOUG SATCHWELL wrote:
I think thats going to be difficult; I can't attend in person (unless 
you're feeling generous and want to pay for flights etc.!), and I 
can't use web conferencing since I'll be at work during teh day and at 
night I don't have a broadband connection (yet). My preference was to 
have the walkthrough in August (after the M9 release) because I'm more 
likely to be at home...is that still a possibility?
This wouldn't require being available in person, as they meet over 
teleconference calls.  
 
Also, in future could you please keep me up to date when you are 
organising these things (CC me on mails etc.), just so I know whats 
going on!
 
That was the intent of this posting.   I needed to choose a tentative 
date for the UI useability workgroup.    The reason I'm trying to get 
this in before M9 was so that we could take the feedback and possibily 
incorporate it in during M9.   I'd rather not have major UI changes 
during release candidates after M9.
You can keep up with the UI workgroup by joining the mailing list:
https://dev.eclipse.org/mailman/listinfo/ui-best-practices-working-group
David had suggested that we run the XSL Tools project through the UI 
workgroup as one of the steps toward graduation.   There might be 
another way to do this by creating some power points or screenshots that 
have some explanations, and this might be able to be handled via the 
mailing list instead of doing a conference calls.   However, I feel that 
you are the best one to answer the questions as to why the UI is 
designed the way it is, as you are most familiar with those portions.
Dave