John,
The Dali JPA project has dependencies on EMF, and will be in-line with
what greater WTP is doing (with the step up to EMF M4) on the 15th.. I
was thinking that something similar could be done with the DTP
dependency. I think that Dali JPA could still be a part of the
declared WTP M4 on the 22nd in this scenario with no need to declare
unofficially. That said, I am new to this game, so I might be missing
something.
As a side note, DTP 1.0 appears to be dependent on EMF 2.2.1. DTP
isn't quite on the Europa track yet , but this doesn't appear to have
caused any problems so far.
Neil
John Lanuti wrote:
Hi Neil,
Ok, that sounds fine. Do you have
dependencies on EMF and if so, will you be on EMF M4 for your DTP 1.0?
If not, I guess we can leave our WTP M4 declaration "unofficial"
until you guys have had a chance to step up to EMF M4.
I'm guessing JSF and ATF may have
their
own schedules as well this go round.
Thanks for the heads up,
John Lanuti
IBM Web Tools Platform Technical Lead, IBM Rational
IBM Software Lab - Research Triangle Park, NC
jlanuti@xxxxxxxxxx
t/l 441-7861
Hi John,
Just a heads up that DTP 1.0 is planned for general availability on the
22nd. I assume we would still want to use this for our M4, but I'm
not sure if there are any logistical issues that would be problematic.
Here is a link to their end game plan for 1.0 - http://www.eclipse.org/datatools/pmc/endgame_plans/dtp_1.0/DTP%201.0%20Endgame%20Plan.htm.
Neil
John Lanuti wrote:
Hey guys,
As determined in the status call last week, there was an overwhelming
interest
in shifting our M4 dates from January to late December. To this end,
here is a reworked proposal for M4 shutdown. Please read and review
and provide any feedback or suggestions and we can come to a concensus
in the meeting on Thursday.
Sunday
|
Monday
|
Tuesday
|
Wednesday
|
Thursday
|
Friday
|
Saturday
|
03
|
04
|
05
|
06
|
07
Smoke Tests
Status Call
|
08
1.5.3 M Build
2.0 I Build
|
09
|
10
|
11
Step up to Platform M4 candidate
|
12
|
13
|
14
Smoke Tests
Status Call
|
15
1.5.3 M Build
(Platform M4)
2.0 I Build
Step up EMF/Platform
|
16
|
17
|
18
Verifications/
Function Test 2.0
|
19
Compatibility Test 2.0
|
20
Fix and M4 Build
|
21
Smoke Tests
Status Call
|
22
1.5.3 M Build
(EMF M4)
Step up EMF
WTP M4
|
23
Break until 2007- Happy Holidays! |
Things to note:
WTP 1.5.3
We will continue with 1.5.3 Maintenance builds as usual.
WTP 2.0
The platform M4 is on Friday December 15th, so we will step up on
Monday
11th to provide any feedback before moving up to the official M4 on
Friday
Dec 15th.
EMF M4 is on Friday December 22nd, so we will step on Friday Dec 15th
so
we have it for the following week's tests. We will slip in the EMF
official M4 on Dec 22 when we declare our M4.
Test
Two day test pass on Monday Dec 18th and Tuesday Dec 19th. First
day consisting of any defect verifications and all functional tests.
The
second day would be any remaining functional tests and the
creation/execution
of compatibility scenarios for WTP 1.5->2.0 and WTP 2.0->1.5.
This
leaves us Wednesday to fix any major or blocking bugs and to spin a WTP
2.0 M4 candidate to smoke test the following day.
Post Dec 22
We will not leave the possibility of adding any defect fixes after Dec
22 into WTP M4 even though the official Europa date is January 5th.
Thanks,
John Lanuti
IBM Web Tools Platform Technical Lead, IBM Rational
IBM Software Lab - Research Triangle Park, NC
jlanuti@xxxxxxxxxx
t/l 441-7861
_______________________________________________
wtp-dev mailing list
wtp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/wtp-dev
_______________________________________________
wtp-dev mailing list
wtp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/wtp-dev
_______________________________________________
wtp-dev mailing list
wtp-dev@xxxxxxxxxxx
https://dev.eclipse.org/mailman/listinfo/wtp-dev
|