Hi TCF committers,
 
We are interested in cutting a stable TCF 1.2 release early this year, potentially in the next couple weeks (in time for EclipseCon March 17-20).
 
Main driver is that we consider TCF in a stable state at this point which we’d like to maintain for a while with small patches only (while making bigger changes in mainstream).
 
The overhead for cutting the 1.2 release early should be relatively small at Eclipse.org -- basically just
1.      
review the IP Log, 
2.      
convert the “Plan” items in the 
http://projects.eclipse.org portal into release docuware, and
3.      
set a Tag + branch in the repository along with a Hudson Job for maintenance builds.
 
We could do all those work items relatively easily.
 
It would then be a separate discussion whether we make our Luna contribution in June off 1.2.1 or 1.3.
 
Does anybody have any concerns with this plan ?
Any bigger changes pending maybe ?
 
 
Thanks,
Martin
--
Martin Oberhuber, SMTS / Product Architect – Development Tools,
Wind River
direct +43.662.457915.85  fax +43.662.457915.6