Doesn't sound correct, the preallocation size must match the increment.  But
if it works for you, then fine.

As for runnning out of sequence numbers see,

http://en.wikibooks.org/wiki/Java_Persistence/Identity_and_Sequencing#Running_Out_of_Numbers

The difference of 1 vs 50 should not effect running out, either you would
run out anyway, or more likely it is the difference between 100 millions
years and 20 millions years...



saasira wrote:
> 
> Hi James,
> 
>     I think I found a solution to my problem...
> 
>    Here is what I did:
> 
>            Database:Postgres
>            Application Server: Glassfish V2.1
> 
>            Database Sequence: Increment=1,Cache=100
>            Sequence Pre Allocation Size Annotation on Entity=100
> 
>   I tried with parallelly/simultaneously populating the data with three
> different applications: eclipselink based application,pgAdmin, psql
> (command
> line shell for postgres); I'm happy to say that everything worked fine
> with
> out any collisions  and no gaps in numbers generated by the sequence. Of
> course, if any of the client has fetched a set of numbers(specified by the
> Cache size) and closed the connection before completely using up the set
> of
> numbers fetched, then there will be unused ids. However, we can eliminate
> this by reducing the cache size to 50 or 25, based on our needs.
> 
> So, the solution is not to synchronize allocation size with sequence
> increment value but to sysnchronize the allocation size with Cache size of
> the sequence.
> In this way, we can eliminate the collision of numbers as well as reduce
> the
> gaps that may be produced in case of Increment_Value Vs allocationSize
> sync..
> If you find any issues with this approach, can you please explain those?
> 
> Thanks and Regards,
> Samba
> 
> 
> On Wed, Nov 11, 2009 at 1:28 PM, Samba <saasira@xxxxxxxxx> wrote:
> 
>> Hi James,
>>     Thanks for your response.
>>
>> I have a need where the same database is used by three different
>> applications: eclipselink , JDBC(legacy), and stored procedures which are
>> used mainly during bulk operations and upgrade scenarios.
>>
>> In such a scenario, I cannot have that luxury of unused id values, as
>> there
>> will be too many over a period of time and the sequence soon
>> becomes exhausted; may be I'm exaggerating when I say that this may
>> happen
>> soon but nevertheless, there will be 50 times lesser available ids,
>> provided
>> allocation size is set at 50.
>>
>> By the way, I suppose that incrementing a sequence value will be DML and
>> not DDL, after all we are not altering the name of the sequence  or
>> dropping
>> it, and databases are capable of handling concurrency.
>>
>> In fact, eclipselink is behaving correctly in case of Table Sequences and
>> updating the SEQUIENCE_COUNT column by 50 when ever it prefetches id
>> values
>> by that number.
>>
>> So, why is this differential treatment in case of native Sequences?
>> shouldn't eclipselink increment the sequence value by 50  as it does in
>> case
>> of Table Sequence?
>>
>>
>>
>>
>>
>>
>>
>>
>>
>>
>> On Tue, Nov 10, 2009 at 9:41 PM, James Sutherland
>> <jamesssss@xxxxxxxxx>wrote:
>>
>>>
>>> The purpose of sequence preallocation is to improve performance.  If you
>>> want
>>> your increment to be 1, then set your preallocation size to 1, and there
>>> will be no issues.  If you want to improve performance, then you need to
>>> set
>>> your increment to the preallocation size, if this is say 50, this will
>>> not
>>> cause any issues with the other application if it assumes it is 1, ids
>>> will
>>> not collide, you will have some unused ids, but that should not be an
>>> issue.
>>>
>>> Changing DDL objects on the fly, is not a very good idea.
>>>
>>>
>>>
>>> saasira wrote:
>>> >
>>> > This following is quoted from the eclipselink User Guide :
>>> >
>>> > "The key difference between Oracle Type Sequencing process and the
>>> process
>>> > involved in table sequencing is that EclipseLink is unaware of the
>>> > INCREMENTconstruct on the
>>>  > SEQUENCE object. EclipseLink sequencing and the Oracle SEQUENCE
>>> object
>>> > operate in isolation. To avoid sequencing errors in the application,
>>> set
>>> > the
>>> > EclipseLink preallocation size and the Oracle SEQUENCE object
>>> INCREMENT
>>> to
>>> > the same value. Note that the Oracle sequence object must have a
>>> starting
>>> > value equal to the preallocation size because when EclipseLink gets
>>> the
>>> > next
>>> > sequence value, it assume it has the previous preallocation size of
>>> > values."
>>> >
>>> > We have a scenario where the database is updated not only by an
>>> eclipse
>>> > link
>>> > based application but by stored procedures as well. for that matter, I
>>> > believe that we cannot make an assumption that the eclipse link is
>>> owning
>>> > the database and operates on it in isolation.
>>> >
>>> > So, if we use the increment value of the  sequence to the
>>> preallocation
>>> > size
>>> > defined on  the eclipse link entity definition, then there will be a
>>> lot
>>> > of
>>> >  sequence values unused.
>>> > But if we set the increment value of the sequence to nominal 1, then
>>> there
>>> > is every chance of collision with the values generated by sequence and
>>> > that
>>> > generated by eclipse link.
>>> >
>>> >
>>> > Now my question is why can't the eclipse link update the sequence
>>> object
>>> > by
>>> > the preallocation size when ever it want to prefetch values? why is it
>>> > updating only by the original increment size of the sequence even
>>> though
>>> > it
>>> > is presuming it acquired the amount o values mentioned in the
>>> > preallocation
>>> > size in the entity?
>>> >
>>> > for example, had eclipse link done some thing like this:
>>> >
>>> > on Oracle:
>>> >
>>> > ALTER SEQUENCE SEQUENCE_NAME INCREMENT BY 'preallocation_size'; where
>>> ever
>>> > eclipse link wanted to prefetch the values
>>> > and then resetting it back to
>>> > ALTER SEQUENCE SEQUENCE_NAME INCREMENT BY 'original_increment_value';
>>> >
>>> >
>>> > then there can be no error at any point , who ever may update the
>>> database
>>> > from any where as long as sequence is properly used.
>>> >
>>> > Can this be achieved by any setting by which I can force elipselink to
>>> > always update the sequence value by preallocation size and not the
>>> > INCREMENT
>>> > SIZE?
>>> >
>>> > Thanks and Regards,
>>> > Samba
>>> >
>>> >
> 
> 


-----
http://wiki.eclipse.org/User:James.sutherland.oracle.com James Sutherland 
http://www.eclipse.org/eclipselink/
 EclipseLink ,  http://www.oracle.com/technology/products/ias/toplink/
TopLink 
Wiki:  http://wiki.eclipse.org/EclipseLink EclipseLink , 
http://wiki.oracle.com/page/TopLink TopLink 
Forums:  http://forums.oracle.com/forums/forum.jspa?forumID=48 TopLink , 
http://www.nabble.com/EclipseLink-f26430.html EclipseLink 
Book:  http://en.wikibooks.org/wiki/Java_Persistence Java Persistence 
-- 
View this message in context: http://old.nabble.com/How-eclipselink-handles-Sequences--tp26283654p26391807.html
Sent from the EclipseLink - Users mailing list archive at Nabble.com.



Back to the top