[
Date Prev][
Date Next][
Thread Prev][
Thread Next][
Date Index][
Thread Index]
[
List Home]
[eclipselink-dev] [Fwd: BUILD STATUS:: 2.0 cb build complete.]
|
FYI. First CB to pass on 2.0 branch (first two builds failed for setup
reasons. 2.0 is good to go... (though still in lock-down unless Peter or
Doug approve a merge).
-Eric
-------- Original Message --------
Subject: BUILD STATUS:: 2.0 cb build complete.
Date: Fri, 27 Nov 2009 21:17:52 -0500
From: eric.gwin@xxxxxxxxxx
To: eric.gwin@xxxxxxxxxx
Build summary for 2.0.0.v20091127-r5938
-----------------------------------
TEST-CORE-SRG
Tests run:683 Failures:0 Errors:0
TEST-JPA-SRG
Tests run:192 Failures:0 Errors:0
TEST-MOXY-SRG
Tests run:458 Failures:0 Errors:0
TEST-SDO-SRG
Tests run:120 Failures:0 Errors:0
TEST-DBWS-SRG
Tests run:14 Failures:0 Errors:0
TEST-DBWS-UTILS-SRG
Tests run:22 Failures:0 Errors:0
-----------------------------------
Build log: (/shared/rt/eclipselink/logs/bsb-2.0_cb_091127-2101.log)
-----------------------------------
SVN Changes since Last Build:
------------------------------------------------------------------------
r5938 | egwin | 2009-11-27 20:57:43 -0500 (Fri, 27 Nov 2009)
Changed paths:
M /branches/2.0/trunk/build.xml
------------------------------------------------------------------------