Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[cross-project-issues-dev] SimRel 2019-09 Milestone 1 (M1) is available

Hi,

The 2019-09 M1 update repository is now available from:

=> http://download.eclipse.org/releases/2019-09/

The EPP Packages will be available soon:

=> https://www.eclipse.org/downloads/packages/release/2019-09/m1

Thanks everyone for participating!


Regards,

Fred

-- Frederic Gurr Release Engineer | Eclipse Foundation Europe GmbH Annastr. 46, D-64673 Zwingenberg Handelsregister: Darmstadt HRB 92821 Managing Directors: Ralph Mueller, Mike Milinkovich, Gaƫl Blondelle

Back to the top