Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[cross-project-issues-dev] SimRel 2019-03 Milestone 3 (M3) is available

Hi,

The 2019-03 M3 update repository is now available (since last Friday actually) from:

=> http://download.eclipse.org/releases/2019-03/

The EPP Packages will be available soon:

=> https://www.eclipse.org/downloads/packages/release/2019-03/m3

Thanks everyone for participating!


Regards,

Mikaël Barbero 
Team Lead - Release Engineering | Eclipse Foundation
📱 (+33) 642 028 039 | 🐦 @mikbarbero
Eclipse Foundation: The Platform for Open Innovation and Collaboration

Attachment: signature.asc
Description: Message signed with OpenPGP


Back to the top