Does anyone know if CDT will be enabled for M1? We can't enable PTP without CDT.
Thanks, Greg I hope everyone has enjoyed their summer
vacations ... but now back to work! :)
We do have a preliminary schedule for
Luna milestones, see
http://wiki.eclipse.org/Luna/Simultaneous_Release_Plan#Schedule
(though, that one table is only part
of that document to review, at the moment).
The complete schedule is still open
for review and "tweaking", but the first several milestones are
pretty much a given, and the first one is due in two weeks! The overall
schedule (of having approximately 6 week milestones) is pretty much just
like previous years. The one main difference is that we "moved up"
M5 and M6 to make sure M6 finished before EclipseCon 2014 started (so ...
we don't allow an "extra week" for end-of-year holidays) and
this M5 and M6 change means M7 is a week longer than usual: 8 weeks instead
of 7!
As always, we hope everyone in 'kepler'
stays in 'luna', but ... to make sure ... we require explicit "buy
in". In practice, this means I started the 'master' branch with what
ever it was for Kepler, but then set enabled="false" for everyone's
contribution. If you plan to be in Luna, please removed the enabled="false"
from your "contribution element". If you are not quite ready
to actually make a contribution, you can put enabled="false"
in your "repository element" to signify the difference of "planning
to participate", but "contribution not ready yet". If nothing
else, you may simply have to wait until your pre-reqs make their contributions.
I have enabled the contributions for
Eclipse and Equinox (with out likely Luna M1 content), and produced a preliminary
"staging" repo ... which has only those two projects in it, at
the moment.
Let the fun begin! As always, questions
to this list are welcome.
_______________________________________________ cross-project-issues-dev mailing list cross-project-issues-dev@xxxxxxxxxxx https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev
|