Re: [cross-project-issues-dev] Concluding SR2 RC1 warm-up repository
|
Adding some more URLs:
Packages for testing:
http://build.eclipse.org/technology/epp/epp_build/juno/download/20130116-1805/
p2 repository with the data for the packages:
http://build.eclipse.org/technology/epp/epp_build/juno/download/20130116-1805/repository/
Thanks,
Markus
On Thu, Jan 17, 2013 at 3:33 PM, David M Williams
<david_williams@xxxxxxxxxx> wrote:
Sorry, fell asleep last night :) when I
should have been sending out this notice.
But, we are done with SR2 RC1 warm-up
repo.
Remember its "staging" location
is
http://download.eclipse.org/releases/maintenance/
Besides testing that repo, be sure to
check the repository reports ... looks like a few regressions for required
files, signed jars, etc.
http://build.eclipse.org/simrel/juno/reporeports/
In addition to testing only that single
repo, be sure to test it as a "composite", since eventually it
will be added to .../releases/juno
as a child repository. See
http://wiki.eclipse.org/SimRel/Simultaneous_Release_FAQ#Test_staging_as_a_pseudo_composite
Don't forget to test "update"
scenarios (some of which need to wait for EPP repositories to be ready,
if they are not already).
Recall that there is no "promotion"
of this repo. It will simply be "left alone" for about a week
... until Juno SR2 RC2 +0.
http://wiki.eclipse.org/Juno/Simultaneous_Release_Plan#SR2
As a "warm-up", we don't expect
this to be a true "release candidate", but please approach RC2,
RC3, etc., with the attitude that those will be true "release candidates"
suitable for adopter acceptance testing, etc.
Thanks,