 Well, 
  
in case this should happen again I guess I could just send 
an E-Mail to cross-project that there is no RCx build, since that's easy to do 
and avoids confusion. 
  
I hope that it won't overload information channels though, 
since I assume that the later we get into the endgame, the more projects will 
actually not have any new contributions for any release 
candidates. 
  
Does anybody have a better suggestion for handling 
this? 
  
Thanks, 
-- 
Martin Oberhuber, Senior Member of Technical 
Staff, Wind River 
direct 
+43.662.457915.85  fax +43.662.457915.6 
   
Hi Martin,
  
Thanks for the clarification. I think the confusion for us is that we're 
using the latest TM stable build and expected there to be one for RC1. If you 
can suggest a way to avoid this in the future, it would be appreciated. 
  
Thanks, 
Greg 
On May 20, 2010, at 12:46 PM, Oberhuber, Martin wrote: 
  
  Greg, 
    
  to be very clear: A TM RC1 build has not been made and 
  never publicly announced. 
  TM RC1 == TM M7. 
    
  I did play with the thought of contributing a late RC1 
  yesterday, and actually  
  performed a build which includes 5 fixes of which 3 were 
  made after the  
  official RC1 cutoff. But since there was 
  not enough time for testing everything, 
  I preferred keeping things as they 
  are. 
    
  I'm sorry if this caused confusion. 
    
  Thanks, 
  -- 
  Martin Oberhuber, Senior Member of Technical 
  Staff, Wind River 
  direct 
  +43.662.457915.85  fax +43.662.457915.6 
    
  
  We have not been able to build against all RC1 components because 
  DSDP TM only completed their RC1+1 build this morning. Given that some 
  projects are this late I think it's reasonable to allow dependent projects 
  some extra time to do their build. 
   
  
  Regards, 
  Greg 
  
  
  On May 20, 2010, at 3:50 AM, Markus Knauer wrote: 
  10 AM (Eastern) for the 
    staging repository - if there is a small problem/error it will cause a 
    delay, but I am confident that it can be done...
  10am - 11.30am -> 
    time frame for building the EPP repo 11.30am +++ -> build the final 
    packages, package maintainer can test and sign off immediately when their 
    package drops out of the build
  Friday 1am -> copy the packages to 
    the mirrors Friday XX pm -> enable package download for all packages 
    that received a "+1" until then
  The consequence of this is (but that 
    is no difference to the last milestones) that a "-1" vote of a package 
    results in disabling it on Friday's release. If possible I would try to fix 
    such a "-1" package, rebuild it and add it some time next week to the 
    download packages, but that needs to be decided as the case 
    arises.
 
  Thanks and regards, Markus
  
    On 20 May 2010 07:42, David M Williams  <david_williams@xxxxxxxxxx> 
    wrote:
      Late again? A little. 
  There is a fairly final /releases/staging 
      repository, but has a few problems: 
  1) I had to remove teneo, since it was failing in a way that would 
      fail whole build .... and Martin Taal contacted me right before I went to 
      bed :) saying he thinks he has it fixed and has started a rebuild. 
      
  2) Riena has a bad pack.gz 
      file, so its set of bundles are incomplete. Christian Campo is actively 
      looking into it .. but he just got up :) 
  3) And ... I just noticed from hudson log ... a new 
      (late) contribution from MPC!?: bug 308687: [releng] 
      include MPC contribution 
  So, 
      I'm willing to check in morning, and promote one more ... if everything is 
      perfectly successful. Otherwise, we'll have an RC1 with what we have right 
      now and ... well, we'll see how it looks Thursday morning. 
      
  I'll set 10 AM (Eastern) as a 
      hard cut-off ... we will be done by then, one way or the other. Oh ... and 
      no one else please use this as an excuse to add some new build/fixes. If 
      your building now, leave it alone and  don't risk breaking anything. 
  If anyone (Markus?) has any concerns with this slightly extended 
      deadline, please just say so. I personally am fine with what we 
      have. 
  And, team, let's please 
      put the "simultaneous" back in simultaneous release, and everyone be on 
      time next week. Or, at least, _you_ write the long note like this one to 
      cross-project explaining why you are late. 
  Thanks all, 
      
  _______________________________________________ cross-project-issues-dev 
      mailing list cross-project-issues-dev@xxxxxxxxxxx https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev
 
 
  _______________________________________________ cross-project-issues-dev 
    mailing list cross-project-issues-dev@xxxxxxxxxxx https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev
     _______________________________________________ cross-project-issues-dev 
  mailing list cross-project-issues-dev@xxxxxxxxxxx https://dev.eclipse.org/mailman/listinfo/cross-project-issues-dev
    
 |