Skip to main content

[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] [List Home]
[cross-project-issues-dev] Still don't see datatools and BIRT matching up


Which in turn prevents TPTP updates from working!

As far as I can tell everyone't latest changes all appear to be there, and, on the surface, seem correct ... but, still when, using the "/staging" site, I can select BIRT, and "select required" (or, even select all of data tools).
and see the following validation errors ... in the "show errors" dialog box.

Requested operation cannot be performed because it would invalidate the current configuration. See details for more information.
  Eclipse BIRT Report Designer Feature (2.1.0.N20060430-1302) requires feature "org.eclipse.datatools.connectivity.oda.designer.feature (0.9.0)", or later version.
  Eclipse BIRT Report Runtime Feature (2.1.0.N20060430-1302) requires feature "org.eclipse.datatools.connectivity.oda.feature (0.9.0)", or later version.
  Eclipse BIRT Example (2.1.0.N20060430-1302) requires feature "org.eclipse.datatools.connectivity.oda.designer.feature (0.9.0)", or later version.

John? Wenfeng? Sue Lee? I'm not sure where the problem is, but needs to be fixed quick!  And FYI .... our Chinese collegues are on a national holidaty this week, so, not sure how much or how often they are checking mail.
So, John, hopefully you can fix on your end.
If it helps .. don't forget you can test on your own machine ... just having them all in development environment (birt and dtp) might make some mismatch obvious.
And, dont' forget, you can test "locally"  by making an "update site" on your own file system.

Hope this helps.


Back to the top