Own connector, performQuery, task summary [message #901890] |
Tue, 14 August 2012 21:51 |
Paul Weingardt Messages: 2 Registered: August 2012 |
Junior Member |
|
|
Hello,
I am writing my own connector and it works well so far (that means I can create and edit tasks).
Except for one thing:
I can edit the summary-field in the task editor, but Eclipse doesn't use this attribute in the task-list (that means, that my list looks like "4:", "5:", where 4 and 5 are the tasks' ids. It should be something like "4: this is a summary") or in the task-editor-tab.
I mean the red parts:
I think I missed something completely, but I can't figure out what.
Thanks for any help and sorry for my bad english.
nobody44
-
Attachment: task.png
(Size: 41.57KB, Downloaded 586 times)
|
|
|
|
Powered by
FUDForum. Page generated in 0.02143 seconds