|
|
Re: Adding a Symbol to the palette [message #673371 is a reply to message #672489] |
Mon, 23 May 2011 12:28 |
Miriam Messages: 29 Registered: April 2011 |
Junior Member |
|
|
Hi,
I actually would like to have a new tool, which allow me to synchronize between different lifelines. something like combined fragment or continuation ( the most important issue that it could cover the lifelines of the sequence diagram ), with a text zone.
I cannot use combined fragment because it has already its own types (seq, alt, loop, ...), and continuation would be great if only I could insert it in the main interaction ( continuation is only allowed in the alt combined fragment, and not outside).
I saw the code, and I tried to have the possibility to add a continuation in the main interaction, but I think I have a problem in ContinuationLocator. For the combined fragment, I cannot add a new type (it's related to InteractionOperatorKind).
So, that's why, if none of these solutions are possible, I am thinking about adding a very new symbol to the palette, to synchronize between lifelines, and with a text zone or a label.
I hope you understood what I do need, it's kind of urgent and important for my project, thanks for your help.
Miriam
|
|
|
Re: Adding a Symbol to the palette [message #673601 is a reply to message #673371] |
Tue, 24 May 2011 08:33 |
|
Drist your need exactly which element of the UML can play this role.
If your want to precise the semantic create a profile with stereotypes. Then you can add in the palette a element with sterotype and modify its behavior by adding editpolicyprovider and editpartprovider...
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered by
FUDForum. Page generated in 0.04295 seconds