Using mylyn time tracking feature [message #43339] |
Fri, 15 February 2008 15:23 |
Jörg Thönnes Messages: 229 Registered: July 2009 |
Senior Member |
|
|
Hi all,
I am not sure whether there is a couple of bugs to discuss this issue. So please redirect me in that
case.
The current feature to track the time on the current task is nice, but not very handy. Normally, I
have an extra time tracking tool running which tracks the elapsed time (ie the time since I clicked
on the specific project). In addition, I can correct or move times from one project to the other one.
Currently, I try to update my time tracker with the data from Mylyn, but I have to remember the last
value before refresh to compute the delta manually.
I would rather do the complete time tracking for this specific task inside Mylyn. But to accomplish
this, I need some features:
1. Both active and elapsed time tracking.
2. It should be possibly to correct both times.
3. I would like to have a day-by-day break-down of the spent time.
In addition, a visual indication like the horizontal green line in the Task view would be nice,
maybe two different colors for "Active" and "Elapsed"
Did there anything happen or is planned to be happen in this area?
Many thanks, Jörg
|
|
|
Re: Using mylyn time tracking feature [message #43813 is a reply to message #43339] |
Thu, 21 February 2008 02:03 |
Eclipse User |
|
|
|
Originally posted by: rob.elves.eclipse.org
Jörg,
Have a quick search though open bugs with [activity] in the subject:
https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=al lwordssubstr&short_desc=%5Bactivity%5D&product=Mylyn &long_desc_type=allwordssubstr&long_desc=&bug_st atus=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED& amp;bug_status=REOPENED&order=Importance
Most if not all your needs do have an associated bug. Vote or comment
on those with your use case or consider creating a new one (and tagging
with [activity]).
-Rob
Jörg Thönnes wrote:
> Hi all,
>
> I am not sure whether there is a couple of bugs to discuss this issue.
> So please redirect me in that case.
>
> The current feature to track the time on the current task is nice, but
> not very handy. Normally, I have an extra time tracking tool running
> which tracks the elapsed time (ie the time since I clicked on the
> specific project). In addition, I can correct or move times from one
> project to the other one.
>
> Currently, I try to update my time tracker with the data from Mylyn, but
> I have to remember the last value before refresh to compute the delta
> manually.
>
> I would rather do the complete time tracking for this specific task
> inside Mylyn. But to accomplish this, I need some features:
>
> 1. Both active and elapsed time tracking.
> 2. It should be possibly to correct both times.
> 3. I would like to have a day-by-day break-down of the spent time.
>
> In addition, a visual indication like the horizontal green line in the
> Task view would be nice, maybe two different colors for "Active" and
> "Elapsed"
>
> Did there anything happen or is planned to be happen in this area?
>
> Many thanks, Jörg
|
|
|
Re: Using mylyn time tracking feature [message #587958 is a reply to message #43339] |
Thu, 21 February 2008 02:03 |
Robert Elves Messages: 87 Registered: July 2009 |
Member |
|
|
Jörg,
Have a quick search though open bugs with [activity] in the subject:
https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=al lwordssubstr&short_desc=%5Bactivity%5D&product=Mylyn &long_desc_type=allwordssubstr&long_desc=&bug_st atus=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED& amp;bug_status=REOPENED&order=Importance
Most if not all your needs do have an associated bug. Vote or comment
on those with your use case or consider creating a new one (and tagging
with [activity]).
-Rob
Jörg Thönnes wrote:
> Hi all,
>
> I am not sure whether there is a couple of bugs to discuss this issue.
> So please redirect me in that case.
>
> The current feature to track the time on the current task is nice, but
> not very handy. Normally, I have an extra time tracking tool running
> which tracks the elapsed time (ie the time since I clicked on the
> specific project). In addition, I can correct or move times from one
> project to the other one.
>
> Currently, I try to update my time tracker with the data from Mylyn, but
> I have to remember the last value before refresh to compute the delta
> manually.
>
> I would rather do the complete time tracking for this specific task
> inside Mylyn. But to accomplish this, I need some features:
>
> 1. Both active and elapsed time tracking.
> 2. It should be possibly to correct both times.
> 3. I would like to have a day-by-day break-down of the spent time.
>
> In addition, a visual indication like the horizontal green line in the
> Task view would be nice, maybe two different colors for "Active" and
> "Elapsed"
>
> Did there anything happen or is planned to be happen in this area?
>
> Many thanks, Jörg
|
|
|
Powered by