Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Modeling » eTrice » planning for release 0.5
planning for release 0.5 [message #1696035] Thu, 21 May 2015 10:00 Go to next message
Thomas Schuetz is currently offline Thomas SchuetzFriend
Messages: 31
Registered: January 2010
Member
Hello,
since we introduced some new features requested by the community and made some major refactorings to keep the architecture sound, we had to change the release date.

Here the new plan:

New date: 30.09.2015

Features:

Big Features and Refactorings (already done):
- architecture refactoring to enable standalone statemachine model, editor and code generator
- integration of rich code editor with proposals (from Google Summer of Code)
- improved inheritance for actor structure and begavior

The main goals for the release are:
Quality:
- stabilize the new features (more testcases)
Documentation:
- create a complete eTrice feature model for deriving documentation and testmanagement for all features
- complete eTrice feature reference documentation
- improved tutorials
- example projects with much more details than the tutorials have
Usability:
- unify and improve Message Sequence Chart (MSC) and Data Logging
- fix some minor editor bugs
- improve code editors and proposals
Runtime:
- add generic runtimes for FreeRTOS and bare metal

Any other topics or changes?

Thomas

Re: planning for release 0.5 [message #1696041 is a reply to message #1696035] Thu, 21 May 2015 10:37 Go to previous messageGo to next message
Henrik Rentz-Reichert is currently offline Henrik Rentz-ReichertFriend
Messages: 261
Registered: July 2009
Senior Member
Hi THomas,

thanks for this proposal.
I think this is a reasonable list for the upcoming release.

-Henrik

Am 21.05.2015 um 12:00 schrieb Thomas Schuetz:
> Hello,
> since we introduced some new features requested by the community and
> made some major refactorings to keep the architecture sound, we had to
> change the release date.
>
> Here the new plan:
>
> New date: 30.09.2015
>
> Features:
>
> Big Features and Refactorings (already done):
> - architecture refactoring to enable standalone statemachine model,
> editor and code generator - integration of rich code editor with
> proposals (from Google Summer of Code)
> - improved inheritance for actor structure and begavior
>
> The main goals for the release are:
> Quality:
> - stabilize the new features (more testcases)
> Documentation:
> - create a complete eTrice feature model for deriving documentation
> and testmanagement for all features
> - complete eTrice feature reference documentation
> - improved tutorials
> - example projects with much more details than the tutorials have
> Usability:
> - unify and improve Message Sequence Chart (MSC) and Data Logging
> - fix some minor editor bugs
> - improve code editors and proposals
> Runtime:
> - add generic runtimes for FreeRTOS and bare metal
> Any other topics or changes?
>
> Thomas
>
>
Re: planning for release 0.5 [message #1696076 is a reply to message #1696035] Thu, 21 May 2015 14:00 Go to previous messageGo to next message
Thomas Jung is currently offline Thomas JungFriend
Messages: 8
Registered: May 2015
Junior Member
Hi all,

another topic:

- cleanup unused runtimes

Thomas
Re: planning for release 0.5 [message #1696086 is a reply to message #1696076] Thu, 21 May 2015 15:38 Go to previous messageGo to next message
Thomas Schuetz is currently offline Thomas SchuetzFriend
Messages: 31
Registered: January 2010
Member
agreed - when I have the ok of everybody, I will create an select bugzillas for the issues
Re: planning for release 0.5 [message #1696941 is a reply to message #1696035] Fri, 29 May 2015 15:55 Go to previous message
Thomas Schuetz is currently offline Thomas SchuetzFriend
Messages: 31
Registered: January 2010
Member
Hi,
we discussed and updated the topics for 0.5.0 M1, M2 and M3 and also pre selected some issues for the 1.0.0 .

Here the open topics sorted by milestone:

https://bugs.eclipse.org/bugs/buglist.cgi?bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&list_id=11840845&order=target_milestone%20DESC%2Cchangeddate%20DESC%2Cbug_severity%2Cbug_id%20DESC&product=eTrice&query_based_on=&query_format=advanced

Thomas
Previous Topic:New Feature: eTrice C project build config automation
Next Topic:[announce] switch eTrice development to Luna
Goto Forum:
  


Current Time: Sat Apr 27 04:52:44 GMT 2024

Powered by FUDForum. Page generated in 0.03826 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top