Home » Archived » BIRT » Graphics using dynamic parameters(Graphics using dynamic parameters)
Graphics using dynamic parameters [message #769718] |
Thu, 22 December 2011 10:30  |
Eclipse User |
|
|
|
Hi everybody,
I created a report using two datasets. In the first data set I have a list of servers and possible metrics such as:
Server Metric
--------------------
Server1 CPU Usage
Server1 Memory Usage
Server1 Disk Usage
Server2 CPU Usage
Server2 Memory Usage
Server2 Disk Usage
In most cases I have the 3 same metrics for every server. I have created two dinamyc parameter which are filled with the information form this data set.
I created a second dataset which brings me all the information for each server and each metric within a range of time.
For example, I have the CPU Usage for the server1 like this:
Date;avg,min,max
2011-04-21 00:30:22:000;15;1;74
2011-04-21 17:20:03:000;8;0;66
2011-04-22 16:41:40:000;8;1;69
2011-05-04 17:01:52:000;29;9;60
2011-05-05 17:01:54:000;33;10;74
What I need to do is graph this information for each server, therefore I created a Table (grouped by server) like the attached file (report.jpg). It is in spanish but equipo=server, metrica=metric, promedio=average.
The resulting table has all the servers and all the metrics, but the graphics are not appearing. I tried the graph separatedly (changing the paremeter for values and it worked ok). What can be wrong? I´m not receiving any errors during the execution, so I have no idea where the problem is.
Regards,
Esteban
Attachment: report.jpg
(Size: 43.51KB, Downloaded 199 times)
|
|
|
Re: Graphics using dynamic parameters [message #769794 is a reply to message #769718] |
Thu, 22 December 2011 12:10   |
Eclipse User |
|
|
|
Can you put the data in flat files and change the datasets to use them
and post the report so we can run it?
Jason
On 12/22/2011 10:30 AM, Esteban Lus Bietti wrote:
> Hi everybody,
>
> I created a report using two datasets. In the first data set I have a list of servers and possible metrics such as:
>
> Server Metric
> --------------------
> Server1 CPU Usage
> Server1 Memory Usage
> Server1 Disk Usage
> Server2 CPU Usage
> Server2 Memory Usage
> Server2 Disk Usage
>
> In most cases I have the 3 same metrics for every server. I have created two dinamyc parameter which are filled with the information form this data set.
>
> I created a second dataset which brings me all the information for each server and each metric within a range of time.
>
> For example, I have the CPU Usage for the server1 like this:
> Date;avg,min,max
> 2011-04-21 00:30:22:000;15;1;74
> 2011-04-21 17:20:03:000;8;0;66
> 2011-04-22 16:41:40:000;8;1;69
> 2011-05-04 17:01:52:000;29;9;60
> 2011-05-05 17:01:54:000;33;10;74
>
> What I need to do is graph this information for each server, therefore I created a Table (grouped by server) like the attached file (report.jpg). It is in spanish but equipo=server, metrica=metric, promedio=average.
>
> The resulting table has all the servers and all the metrics, but the graphics are not appearing. I tried the graph separatedly (changing the paremeter for values and it worked ok). What can be wrong? I´m not receiving any errors during the execution, so I have no idea where the problem is.
>
> Regards,
>
> Esteban
>
>
|
|
| | | | | | | | | | | |
Re: Graphics using dynamic parameters [message #777512 is a reply to message #777462] |
Tue, 10 January 2012 11:06  |
Eclipse User |
|
|
|
Esteban,
Yes I can do a webex. Send me an email at jasonweathersby at windstream
dot net.
Jason
On 1/10/2012 9:55 AM, Esteban Lus Bietti wrote:
> Hi Jason,
>
> Sorry for the delay in my answer. I tried creating a new report as the nested you attached (which works ok) is but I can´t get it working. I noticed in the inner dataset the parameter is not bounded to the report parameter, but my inner datasource is throwing me an error that it cannot fecth the next row (see attached screen).
> I´m also attaching you the report so you can take a look at it. I don´t know where the problem is.
>
> I don´t want to abuse of your time but is there a way we can set up a webex or anything so you can take a look at the report "live" and test it?
>
> Thanks a lot for your help.
>
> Regards,
>
> Esteban.
|
|
|
Goto Forum:
Current Time: Wed Jul 23 19:51:14 EDT 2025
Powered by FUDForum. Page generated in 0.05030 seconds
|