Skip to main content



      Home
Home » Archived » Sapphire » Re-scheduling Sapphire 0.3.1 release
Re-scheduling Sapphire 0.3.1 release [message #688084] Thu, 23 June 2011 18:01 Go to next message
Eclipse UserFriend
The current schedule has Sapphire 0.3.1 shipping on September 1st while Indigo SR1 is scheduled for September 30th. That mis-alignment was driven by Oracle adopter requirements. These requirements no longer exist and I would like to re-align our 0.3.1 release with Indigo SR1.

Would this change in schedule present a problem for other adopters? We can schedule multiple 0.3.x releases if necessary, but if I don't hear otherwise, I will assume that the schedule change is ok with everyone.

- Konstantin
Re: Re-scheduling Sapphire 0.3.1 release [message #723526 is a reply to message #688084] Thu, 08 September 2011 14:25 Go to previous messageGo to next message
Eclipse UserFriend
Konstantin,

Is it possible to include some bug fixes like InitialValueServices, Doctype etc., as part of the 0.3.1 release ? I am planning to use them in my Liferay IDE contribution where these fixes are very essential.

We can have other bugs like XMLSchema, Content Assist as part of 0.4 release or next 0.3.x release .

Let me know your thoughts.

~Kamesh
Re: Re-scheduling Sapphire 0.3.1 release [message #723573 is a reply to message #723526] Thu, 08 September 2011 16:51 Go to previous messageGo to next message
Eclipse UserFriend
I do not believe that is going to be feasible. Those changes are tied up with other 0.4 work which cannot be backported to 0.3.x as it isn't backwards compatible.

- Konstantin
Re: Re-scheduling Sapphire 0.3.1 release [message #723649 is a reply to message #723573] Fri, 09 September 2011 00:16 Go to previous messageGo to next message
Eclipse UserFriend
So when are we planning for 0.4 ?
Re: Re-scheduling Sapphire 0.3.1 release [message #723811 is a reply to message #723649] Fri, 09 September 2011 10:41 Go to previous message
Eclipse UserFriend
The 0.4 release is tentatively planned for early December. The exact working date is December 1st.

You can find information like this on the project summary page or on the pages of various releases...

http://www.eclipse.org/projects/project_summary.php?projectid=technology.sapphire
http://www.eclipse.org/sapphire/releases/
http://www.eclipse.org/sapphire/releases/0.4/

- Konstantin
Previous Topic:DiagramEditor - Manage nodes and edges separatly
Next Topic:Sapphire at EclipseCon Europe 2011
Goto Forum:
  


Current Time: Sun Jul 27 09:22:05 EDT 2025

Powered by FUDForum. Page generated in 0.03496 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top