Ordering in Sequence Diagram [message #626652] |
Tue, 03 June 2008 06:10 |
Eclipse User |
|
|
|
Hi all,
i have specified a Sequence Diagram with some Messages and Execution
Specifications, etc., manually with the UML tree editor. My problem is:
Where is the sequence of the messages, which are being send, specified?
Currently it is so, that I have defined two messages a and b, were a occurs
before b. Now i've inserted a third message c, which should be placed before
the occurence of a. But that message c is physically represented in the XMI
after b. So, how does the "diagram" knows that c should be occure before a,
even if it was later added?
In the UML Superstructure there is a General Ordering, but i think, this is
not the correct element to define the implicit sequence of messages?
Any help will be appreciated.
Thx
Timothy
|
|
|
Powered by
FUDForum. Page generated in 0.03311 seconds