Message ordering in sequence diagram [message #625114] |
Mon, 08 October 2007 05:36 |
Eclipse User |
|
|
|
Originally posted by: antti.evesti.vtt.fi
Hi,
I use TOPCASE UML editor to producing Eclipse UML2 files. If I draw a
sequence diagram that contains two lifelines and two messages between them,
I can see which message occurs first from the graphical representation, i.e.
time is running from top to down.
But how I can get this information from the Eclipse UML2 file? I have
inspected UML2 file as a tree structure, but I cannot find information about
the message order. Hence, where this information is stored? In addition, how
I can find this information by utilizing UML2 API?
Regard,
Antti Evesti
|
|
|
Powered by
FUDForum. Page generated in 0.03852 seconds