Hi,
I have set up my project for use with CVS using the EPF CVS guidelines and
it kinda works (except I have to Share the project again each time I
restart EPF! When I do a synchronize, all my elements are given a pencil
icon (non-synchronized?) only those I edit in this session gets the
databse (synchronized) icon. Hmmm...
I defined a capability pattern. Created some activities. Added some tasks.
These tasks all have the same Roles assigned, however when I create the
corressponding Task Descriptors, linked to these Tasks only a few of the
TDs get corresponding Role Descriptors transferred. For the other tasks, I
can not by any means create Role Descriptors for some odd reason. All my
TDS are set to be "synchronized with source". Any idea what could be wrong?
If I delete a Task Descriptor and try to add it again (using drag and drop
from Navigator into Activity) I am unable to. It does NOT register at all.
Could be a CVS issue!? I am lost here...
If I drag'n drop any Task into my Capability pattern, Im told it is not
part of my default configuration of my proces. What does this mean?
Kristian
|
|
|
|
Re: Synchronization problems with Tasks, Role Descriptors and CVS [message #53656 is a reply to message #53604] |
Mon, 15 September 2008 16:03  |
Eclipse User |
|
|
|
How do you create task descriptors first time thru DND or manually
creating in activity and then linking to task. If you DND task into
activity/cap pattern it should bring it's roles/wps creating corresponding
descriptors assuming it's in configuration. If those roles/wps are not in
configuration, it wont' bring it along. You can add those roles/wps for
the process' default configuration if you need it. Synchronization also
works on the default configuration. By default, all descriptors have
"Synchronized with source" selected, that's coming from meta-model because
we defined it that way.
You can check whether you can reproduce any of these without CVS to see
whether CVS is causing this or not.
--
Shilpa
|
|
|
Re: Synchronization problems with Tasks, Role Descriptors and CVS [message #590583 is a reply to message #53604] |
Mon, 15 September 2008 06:17  |
Eclipse User |
|
|
|
It turned out, that my configuration .xmi file had ditched the first part
of its GUID for some odd reason! All my references to my configuration
were thus invalid and hence I coulds add Role Descriptors as no Roles were
part of my default UNRESOLVED plugin. Still, I don't understand why I must
manually add Role Descriptors for Each Task Descriptor. Why not by default
inherit those defined for the Task?
|
|
|
Re: Synchronization problems with Tasks, Role Descriptors and CVS [message #590593 is a reply to message #53604] |
Mon, 15 September 2008 16:03  |
Eclipse User |
|
|
|
How do you create task descriptors first time thru DND or manually
creating in activity and then linking to task. If you DND task into
activity/cap pattern it should bring it's roles/wps creating corresponding
descriptors assuming it's in configuration. If those roles/wps are not in
configuration, it wont' bring it along. You can add those roles/wps for
the process' default configuration if you need it. Synchronization also
works on the default configuration. By default, all descriptors have
"Synchronized with source" selected, that's coming from meta-model because
we defined it that way.
You can check whether you can reproduce any of these without CVS to see
whether CVS is causing this or not.
--
Shilpa
|
|
|