Skip to main content



      Home
Home » Modeling » UML2 » Message ordering in sequence diagram
Message ordering in sequence diagram [message #476344] Mon, 08 October 2007 05:36 Go to next message
Eclipse UserFriend
Originally posted by: antti.evesti.vtt.fi

Hi,

I use TOPCASE UML editor to producing Eclipse UML2 files. If I draw a
sequence diagram that contains two lifelines and two messages between them,
I can see which message occurs first from the graphical representation, i.e.
time is running from top to down.

But how I can get this information from the Eclipse UML2 file? I have
inspected UML2 file as a tree structure, but I cannot find information about
the message order. Hence, where this information is stored? In addition, how
I can find this information by utilizing UML2 API?

Regard,
Antti Evesti
Re: Message ordering in sequence diagram [message #476355 is a reply to message #476344] Tue, 09 October 2007 13:58 Go to previous message
Eclipse UserFriend
There have been some previous postings on this subject. Try the links below
as a starter..

http://dev.eclipse.org/newslists/news.eclipse.tools.uml2/msg 02376.html
http://dev.eclipse.org/newslists/news.eclipse.tools.uml2/msg 04303.html

- James.

"Antti Evesti" <antti.evesti@vtt.fi> wrote in message
news:fectn2$9mi$1@build.eclipse.org...
> Hi,
>
> I use TOPCASE UML editor to producing Eclipse UML2 files. If I draw a
> sequence diagram that contains two lifelines and two messages between
> them, I can see which message occurs first from the graphical
> representation, i.e. time is running from top to down.
>
> But how I can get this information from the Eclipse UML2 file? I have
> inspected UML2 file as a tree structure, but I cannot find information
> about the message order. Hence, where this information is stored? In
> addition, how I can find this information by utilizing UML2 API?
>
> Regard,
> Antti Evesti
>
Re: Message ordering in sequence diagram [message #625167 is a reply to message #476344] Tue, 09 October 2007 13:58 Go to previous message
Eclipse UserFriend
There have been some previous postings on this subject. Try the links below
as a starter..

http://dev.eclipse.org/newslists/news.eclipse.tools.uml2/msg 02376.html
http://dev.eclipse.org/newslists/news.eclipse.tools.uml2/msg 04303.html

- James.

"Antti Evesti" <antti.evesti@vtt.fi> wrote in message
news:fectn2$9mi$1@build.eclipse.org...
> Hi,
>
> I use TOPCASE UML editor to producing Eclipse UML2 files. If I draw a
> sequence diagram that contains two lifelines and two messages between
> them, I can see which message occurs first from the graphical
> representation, i.e. time is running from top to down.
>
> But how I can get this information from the Eclipse UML2 file? I have
> inspected UML2 file as a tree structure, but I cannot find information
> about the message order. Hence, where this information is stored? In
> addition, how I can find this information by utilizing UML2 API?
>
> Regard,
> Antti Evesti
>
Previous Topic:Missing source/target attribute from ActivityEdge when xmi:id different than name attribute
Next Topic:Property redefinitions
Goto Forum:
  


Current Time: Sat Aug 30 23:56:12 EDT 2025

Powered by FUDForum. Page generated in 0.03423 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top