Skip to main content



      Home
Home » Eclipse Projects » BPMN 2.0 Modeler » Sequence Flows connection Bug
Sequence Flows connection Bug [message #1006744] Fri, 01 February 2013 11:31 Go to next message
Eclipse UserFriend
Hello,

In page 112 of the BPMN2.0 spec it was clearly stated that

Quote:
A Pool acts as the container for the Sequence Flows between Activities (of a contained Process). The Sequence Flows can cross the boundaries between Lanes of a Pool (see page 305 for more details on Lanes), but cannot cross the boundaries of a Pool. That is, a Process is fully contained within the Pool. The interaction between Pools is
shown through Message Flows


In the BPMN2.0 modeler it is always possible to connect two tasks which belong to two different pools, via a sequence flow.

So i think this should be reported as a bug, what do you think?

Thanks.
HB

[Updated on: Fri, 01 February 2013 11:32] by Moderator

Re: Sequence Flows connection Bug [message #1006759 is a reply to message #1006744] Fri, 01 February 2013 12:14 Go to previous message
Eclipse UserFriend
Hi Hassan, and thanks again for keeping me honest Smile Yes, this is a known bug but I haven't recorded it yet as it hasn't made it to the top of my priority list. Can you please file a bug report?

Thanks you!
Bob
Previous Topic:Message Flow Connection rules and Task's attributes
Next Topic:Stacktrace on right click.
Goto Forum:
  


Current Time: Wed Jul 23 06:03:55 EDT 2025

Powered by FUDForum. Page generated in 0.05490 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top