Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Eclipse Projects » GEF » How to update connections to sub-figures?
How to update connections to sub-figures? [message #229710] Wed, 24 January 2007 10:45
Fredrik Robertssen is currently offline Fredrik RobertssenFriend
Messages: 22
Registered: July 2009
Junior Member
Hi,

I have an editor with a typical graph structure, nodes and edges. I can
drag nodes around, and edges follow nicely.

However, I added sub-figures (modeled also as separate edit parts) to my
nodes (symbolizing ports). Those edges attached to the ports of a node are
not updated when I move the node. When I open the editor again, the edges
are correctly connected to the port. (Though I expect there is simply
missing an notification to the edges that they should update.)

So, what do I have to do that not only connection attached to the nodes
are updated once the node moves, but also thos connection attached to the
sub-figures of the node (the ports)?

Thanks in advance!
Previous Topic:toolbar visibility
Next Topic:copy & paste in GEF
Goto Forum:
  


Current Time: Mon Sep 23 12:11:23 GMT 2024

Powered by FUDForum. Page generated in 0.03763 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top