connection problem [message #211377] |
Fri, 10 March 2006 04:32 |
Eclipse User |
|
|
|
Originally posted by: spike.m.yahoo.com
hi,
i have problem with respect to connection , i have an editpart which
contains all the children,this editpart can have another instance also eg.
----------------------------- editpart1 (e1) -- parent
| $-------$ (child)| $(diagram) ---- child inside parent i.e
e1
-----------------------------
|
|
|
----------------------------- editpart2 (e2)
| $-------$ |
-----------------------------
these 2 can be connected also the children within it.......
a) the moment i make a connection within e1 or e2 the false connection
line that comes along with the pointer instead of following the
pointer gets attached to e1 boundry and remains static.
b)when the connection is complete it comes back as connection between the
2 ($).
c)wen i remove graph node policy from e1 it behaves properly ..i.e wen i
make connection to $1 and move the pointer towards the $2 it follows the
pointer i.e the false connection.
d)what i did was the moment i try to create connection on $'s i remove
graph_node_policy from e1 and wen the connection gets up i re install
it.
e)it is working fine but i dnt think this is the right way .....
can any one suggest any idea??????
thanks in advance
NOTE: $ resembles a diagram
regards
Shahean
|
|
|
Powered by
FUDForum. Page generated in 0.05692 seconds