|
Re: I have seen references to sub-tasks... [message #18882 is a reply to message #18774] |
Wed, 25 July 2007 05:35 |
Eclipse User |
|
|
|
Originally posted by: beatmik.acm.org
Steffen Pingel (Trac Connector component owner) is currently traveling
and I have not heard of Trac support subtasks. If they don't support
it, the best thing to do is probably to file a bug against Trac (if you
would like to see such support) and once they add it file a bug against
Mylyn.
Mik
David Goodenough wrote:
> but I do not seem to find an way to create them. Is the
> problem that Trac does not support them (I am using Trac) or was
> this a concept that dissappeared and the document I was reading
> was old or am I missing something.
>
> David
|
|
|
|
Powered by
FUDForum. Page generated in 0.03466 seconds