Skip to main content


Eclipse Community Forums
Forum Search:

Search      Help    Register    Login    Home
Home » Eclipse Projects » GEF » Replacing a Figure on the Fly
Replacing a Figure on the Fly [message #191932] Thu, 11 August 2005 21:56 Go to next message
Eclipse UserFriend
Originally posted by: craig.officeextend.com

I'd like to replace a part's figure based upon a model change. I have an
event handler in the part listening for the change. What would be the
correct calls to make to completely replace the part's existing figure
with a new, different one?

I'm sure the answer is simple, but figures seem to be managed
automagically somehow and I don't want to gum up those works.
Re: Replacing a Figure on the Fly [message #191936 is a reply to message #191932] Thu, 11 August 2005 22:40 Go to previous message
Vineet Sinha is currently offline Vineet SinhaFriend
Messages: 31
Registered: July 2009
Member
See posting in this newsgroup titled "Changing figures for edit parts"
and https://bugs.eclipse.org/bugs/show_bug.cgi?id=42786

Vineet

Craig Fransen wrote:
> I'd like to replace a part's figure based upon a model change. I have
> an event handler in the part listening for the change. What would be
> the correct calls to make to completely replace the part's existing
> figure with a new, different one?
>
> I'm sure the answer is simple, but figures seem to be managed
> automagically somehow and I don't want to gum up those works.
>
Previous Topic:schema example - hack to add initial location for TablePart?
Next Topic:Highlighting Edit Parts in Error
Goto Forum:
  


Current Time: Thu Dec 12 19:56:21 GMT 2024

Powered by FUDForum. Page generated in 0.03748 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top