Questions about 2.0 (and future deliverables) [message #90317] |
Fri, 11 November 2005 15:41  |
Eclipse User |
|
|
|
Originally posted by: phazzard.moshierislandgroup.com
Hello;
Have upgraded to 2.0 M2 and must say - it rocks! I have a few general
questions or "requirements" that I hope someone from the development team
can respond to. I would liek to know if there Feel free to ask for
clarification if my requests are too sketchy:
* We would like to be able to run "unqualified" SQL. Any way to provide a
configurable default schema for SQL? This would be to support migration
from dev->qa->prod where schemas change at different project phases.
* In the viewer, is it possible to suppress the initial running of the
report with default parameter values? This would prevent the report from
running until the user pressed the "run report" button.
* Any recommended approach (or support) for using BIRT in a batch mode?
We would like to schedule the running (and possibly distribution) of
reports to run overnight and allow the user the option of looking at
pre-run results or running in real time.
Thanks for all the great work.
Pete H
|
|
|
|
|
|
|