Re: Flow between two events in two pools. [message #614235 is a reply to message #614232] |
Mon, 07 April 2008 13:11 |
Eclipse User |
|
|
|
Originally posted by: atoulme.intalio.com
Sara, only intermediate message events can send and receive messages, so
only them are allowed to draw messaging edges, along with multiple and
signal events since we added BPMN 1.1 support.
Thanks,
Antoine
Sara wrote:
> Hi Antoine,
>
> Thanks for your response. Yes, I saw this examples but I didn't find
> there any situation like I was looking for. In BPMN modeler we can't do
> something like:
> 1) Intermediate event in one pool - flow (dashed line) - start event in
> second pool
> 2) Start event in one pool - dashed line - intermediate event in second
> pool
> 3) Start event in one pool - dashed line - end event in second pool, am
> I right? I know that this tree situations are consistent with BPM Notation.
>
> BTW. I know that in BPMN modeler we can do something like: End event in
> one pool - flow (dashed line) - Start / Intermediate event in in second
> pool.
>
> Thanks,
> Sara
>
|
|
|
|
Re: Flow between two events in two pools. [message #614254 is a reply to message #614236] |
Tue, 08 April 2008 10:10 |
Eclipse User |
|
|
|
Originally posted by: atoulme.intalio.com
Sara, just go grab the latest build. BPMN 1.1 is on by default.
If you want the BPMN 1.1 specification from the OMG, just go and get it
here:
http://www.omg.org/spec/BPMN/1.1/
Thanks,
Antoine
Sara wrote:
> Antoine, you are right. I forgot add that I think about message events ;)
> Thanks for help and information that I can find this support in BPMN 1.1.
>
> BTW. Is it possible download BPMN 1.1 from somewhere because I didn't
> saw it anywhere?
>
> Thanks,
> Sara
>
|
|
|