Skip to main content



      Home
Home » Eclipse Projects » OSEE » Starting state for a Workflow Configuration - can it be changed?
Starting state for a Workflow Configuration - can it be changed? [message #516556] Wed, 24 February 2010 06:59 Go to next message
Eclipse UserFriend
Hi All,

I have created a new Workflow Configuration that starts with a state other than "Endorse". However, when I create an action against an actionable item that uses the configuration, it is created in the "Endorse" state and has no content.
Have I missed a step, or does a Workflow always have to start with a state called "Endorse"?

All the best,

Mark

[Updated on: Fri, 26 March 2010 08:19] by Moderator

Re: Starting state for a Workflow Configuration - can it be changed? [message #525553 is a reply to message #516556] Tue, 06 April 2010 17:13 Go to previous messageGo to next message
Eclipse UserFriend
Mark,

It was once the design that the "Endorse" state was required; however, we have since introduced the concept of the start state (regardless of the state's name). Unfortunately there is an unnecessary hard coded reference to the endorse state. Please create a Bugzilla item and we will get it fixed.

Thanks,
Ryan Brooks
Re: Starting state for a Workflow Configuration - can it be changed? [message #525740 is a reply to message #525553] Wed, 07 April 2010 12:07 Go to previous message
Eclipse UserFriend
Mark has created the corresponding Bugzilla item for this: https://bugs.eclipse.org/bugs/show_bug.cgi?id=308305
Re: Starting state for a Workflow Configuration - can it be changed? [message #576501 is a reply to message #516556] Tue, 06 April 2010 17:13 Go to previous message
Eclipse UserFriend
Mark,

It was once the design that the "Endorse" state was required; however, we have since introduced the concept of the start state (regardless of the state's name). Unfortunately there is an unnecessary hard coded reference to the endorse state. Please create a Bugzilla item and we will get it fixed.

Thanks,
Ryan Brooks
--
Thanks,
Ryan Brooks
Re: Starting state for a Workflow Configuration - can it be changed? [message #576534 is a reply to message #576501] Wed, 07 April 2010 12:07 Go to previous message
Eclipse UserFriend
Mark has created the corresponding Bugzilla item for this: https://bugs.eclipse.org/bugs/show_bug.cgi?id=308305
Previous Topic:Enumerations used in the OSEE database
Next Topic:Enumerations used in the OSEE database
Goto Forum:
  


Current Time: Fri Apr 18 13:31:51 EDT 2025

Powered by FUDForum. Page generated in 0.05637 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top