TPTP 4.2 M3 Development Build Available [message #45772] |
Fri, 09 December 2005 12:00 |
Eclipse User |
|
|
|
Having recently completed our TPTP 4.1 release, we are looking forward to
our TPTP 4.2 release (targeted for June 2006).
Toward this, our TPTP 4.2 "M3" build is now available. This is our first
build of TPTP 4.2 (functionally equivalent to our TPTP 4.1 release) based on
Eclipse Platform 3.2 M3 and EMF 2.2 M3 build. Going forward we will be
adding TPTP 4.2 enhancements and continuing to align with the June 2006
"release train" builds.
As always, we appreciate your feedback in the TPTP newsgroup and/or by
reporting bugs through bugzilla.
Thanks,
Tyler Thessin
PMC Lead | Eclipse TPTP Project | www.eclipse.org
Engineering Manager | Intel Corporation / Software Products Division |
www.intel.com
|
|
|
Powered by
FUDForum. Page generated in 0.02299 seconds