Skip to main content



      Home
Home » Modeling » Papyrus » Cannot create control flows between activities (SySML activity diagrams)
Cannot create control flows between activities [message #1806426] Wed, 08 May 2019 16:09 Go to next message
Eclipse UserFriend

New to Papyrus. I cannot create control flows between activities in a SysML activity diagram . I place two activites on an activity diagram and then select "Control Flow" in the pallet and try to link the two activities and it will not let me do it. I must have some setting wrong as I tested linking the initial node to the final node as a test and the connection drew fine. Using Papyrus version 2019-03 (4.11).

Re: Cannot create control flows between activities [message #1806964 is a reply to message #1806426] Mon, 20 May 2019 05:10 Go to previous message
Eclipse UserFriend
Hi,

In the UML Norm, you can find : 'A ControlFlow is an ActivityEdge traversed by control tokens or object tokens of control type, which are use to control the execution of ExecutableNodes.'
The 'Activity' object is not an ExecutableNode so you cannot link Acitivites with 'Control Flow' edge.

HTH,
Nicolas
Previous Topic:Use case profile
Next Topic:Missing class while trying to generate Activity Diagram
Goto Forum:
  


Current Time: Sat Jul 12 13:42:07 EDT 2025

Powered by FUDForum. Page generated in 0.26280 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top