Skip to main content



      Home
Home » Eclipse Projects » Oomph » Sort tasks
Sort tasks [message #1690440] Fri, 27 March 2015 06:27 Go to next message
Eclipse UserFriend
Hello there,

When we are in the Oomph installer, after we loaded the setup file, we need to fill all variables. But it is a bit messy, I would like to order them, is it possible ? Is there some sections I could add ?

Thanks.
Re: Sort tasks [message #1690505 is a reply to message #1690440] Fri, 27 March 2015 12:27 Go to previous messageGo to next message
Eclipse UserFriend
Zachery,

Comments below.

On 27/03/2015 4:23 PM, Zachary Labaysse wrote:
> Hello there,
>
> When we are in the Oomph installer, after we loaded the setup file, we
> need to fill all variables. But it is a bit messy, I would like to
> order them, is it possible ?
No. It's indeed a bit annoying, but with overrides and the many scopes
in which they appear, it's hard to produce a meaningful order.
Hopefully we'll find time to revisit that at some point.

Are these your own variables you've introduced or just the ones that
come from the catalogs and projects we already have?
> Is there some sections I could add ?
No at this point (and that would introduce yet more complexity in the
already-hard-to-manage variables page)...
>
> Thanks.
Re: Sort tasks [message #1690641 is a reply to message #1690505] Mon, 30 March 2015 07:08 Go to previous message
Eclipse UserFriend
> Are these your own variables you've introduced or just the ones that
> come from the catalogs and projects we already have?

These are both.

Thanks for your reply, I am looking forward some news about variables' sorting.
Previous Topic:JDT UI cannot complete install
Next Topic:Have the Project Catalogs gone off-line?
Goto Forum:
  


Current Time: Sun Jul 06 21:33:52 EDT 2025

Powered by FUDForum. Page generated in 0.26464 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top