Datefield in RAP client [message #1033634] |
Thu, 04 April 2013 09:06  |
Eclipse User |
|
|
|
Hi all,
in a DateField in Scout applications you can step day-wise by pressing the down-key or up-key. It seems that in the RAP client for each press of the down-key/up-key two days are skipped instead of one day (like in the SWT or Swing client). So for example if the current date in the field is '07.04.2013' it changes to '09.04.2013' after one press of the up-key.
I created a minimal example with the "Application with a single form" template and a single date field (see attachement) with Scout 3-9, nightly build (3.9.0.20130404-0148).
Is this a known bug? Or did I miss something?
Thanks in Advance,
David
|
|
|
|
Powered by
FUDForum. Page generated in 0.07402 seconds