Temporary TaskDeactivation while launching External Tools [message #595645] |
Wed, 07 January 2009 16:21 |
Ivan Pea Messages: 4 Registered: July 2009 |
Junior Member |
|
|
Dear Sirs.
We have some Launches defined, with the "External Tools Configuration"
feature in Eclipse. (Mostly these are build.xml files for ant).
These launches generate java-classes, based on a XML-file containing
message-definitions.
(After a Launch is finnished, Eclipse allowes to specify that the
workspace should be refreshed.Which compiles the generated java-classes)
The problem is, that the generated java-classes show up in the active
Mylyn task. Even though they never have been in any Editor.
It would be great, if the Active task, was temporarily deactivated,
while this auto-generation & compilation takes place.
Possibly this temporaty deactivation would best be placed in
in the "Refresh-folder" of the "External Tools Configuration" window.
Perhaps there are even better solutions.
Best regards
Ivan P.
|
|
|
Powered by
FUDForum. Page generated in 0.03698 seconds