Re: drawing sequence diagram [message #486376] |
Thu, 17 September 2009 09:32  |
Eclipse User |
|
|
|
... forwarding to UML2 Tools newsgroup.
Although I suspect this is a question specific to UML2 Tools, did you try:
- Select the message, then start typing.
- Select the message, then from the toolbar, select "All Connector Labels"
or "No Connector Labels" to hide or show all labels associated with
connectors.
Regards,
- James.
"Bruce Frazer" <bfrazer@adobe.com> wrote in message
news:98293f1e4d477181f41f59e1d4cf3f13$1@www.eclipse.org...
> This must be a silly question, but after I draw in a "message" between two
> "lifelines", how to I change the visible text over the message arrow?
>
> I tried changing the "name" property of the message, but it does not
> display.
>
> My message arrows all have text more or less like: 1: *
>
|
|
|
|
|
|
Powered by
FUDForum. Page generated in 0.05659 seconds