Tcl Task Tag problems [message #30850] |
Wed, 03 September 2008 11:10 |
Ophélie Messages: 3 Registered: July 2009 |
Junior Member |
|
|
Hello,
We use Eclipse DLTK ganymede to program in Tcl. So, this tool is very
usefull and facilitates us the programming in Tcl.
But, we just have a little problem about Task tag. I explain.
We have a lot of big projects which are saved and referenced by version on
a perforce server. This server permit us to save, modify, download
different files of projects, and to class all projects about their number
of versions. This server permit to centralize all works of peoples on
company.
So, when we want to work with a created project, first of all we have to
check out Tcl changed files of project from perforce server, that makes
these changed files writable on Eclipse but not all project. In fact
entire project is open on Eclipse, but just some files are writable.
So, on no-writable files of eclipse, Task Tag not recongnize "Todo"
comment as a task.
And the other problem is, when we configure Preferences/Tcl/Task Tag,
after a restart of Eclipse this configuration come back per default even
if we saved this configuration.
Thank you for your help
Best regards
Ophelie
|
|
|
Re: Tcl Task Tag problems [message #30920 is a reply to message #30850] |
Fri, 05 September 2008 02:42 |
Andrei Sobolev Messages: 72 Registered: July 2009 |
Member |
|
|
Hi Ophélie,
I've could not reproduce first problem you specified, could you please provide exact steps you perform and project
structure. May be you could simulate situation on not perforce project.
For a second problem I've created bug in eclipse https://bugs.eclipse.org/bugs/show_bug.cgi?id=246311
Best regards,
Andrei Sobolev.
> Hello,
>
> We use Eclipse DLTK ganymede to program in Tcl. So, this tool is very
> usefull and facilitates us the programming in Tcl.
>
> But, we just have a little problem about Task tag. I explain.
> We have a lot of big projects which are saved and referenced by version
> on a perforce server. This server permit us to save, modify, download
> different files of projects, and to class all projects about their
> number of versions. This server permit to centralize all works of
> peoples on company.
>
> So, when we want to work with a created project, first of all we have to
> check out Tcl changed files of project from perforce server, that makes
> these changed files writable on Eclipse but not all project. In fact
> entire project is open on Eclipse, but just some files are writable. So,
> on no-writable files of eclipse, Task Tag not recongnize "Todo" comment
> as a task.
>
> And the other problem is, when we configure Preferences/Tcl/Task Tag,
> after a restart of Eclipse this configuration come back per default even
> if we saved this configuration.
>
> Thank you for your help
> Best regards
>
> Ophelie
>
>
|
|
|
|
Powered by
FUDForum. Page generated in 0.03559 seconds