Skip to main content



      Home
Home » Archived » BIRT » scatter plot connect missing points question
scatter plot connect missing points question [message #191366] Thu, 21 September 2006 06:37
Eclipse UserFriend
Originally posted by: jhurley12.gmail.com

So i am plotting data over time with a scatter plot chart. I am connecting
the points with a line. I am faking a line graph using a scatter plot so I
can control the min/max of the datetime x-axis. I am specifying a window of
time i want to look at, and the table I am using for the data points might
not contain data with regular intervals. In the cases where there are
breaks in time I would like the chart to create points at zero and connect
those to the rest of the graph rather than filling in the missing values
with a straight line to the next available point. This is misleading for my
chart. Is there any way to force this behavior?

Joe
Previous Topic:how to load BIRT report design perspective in an RCP
Next Topic:Birt Dynamic Text 20060920
Goto Forum:
  


Current Time: Tue Jul 22 00:43:54 EDT 2025

Powered by FUDForum. Page generated in 0.03214 seconds
.:: Contact :: Home ::.

Powered by: FUDforum 3.0.2.
Copyright ©2001-2010 FUDforum Bulletin Board Software

Back to the top